Materials Sheet

NOTE: You have to reload this page before the materials sheet will update, hit F5.

Category Units Amount Cost To Buy List Total Purchased, Units Total Purchased, Dollar Amount
Sod SQFT 12128.00 $ 3888.29 Sod(6064.00), Pallet(6064.00), 0 0 See Invoice List->
Edging FT 676.00 $ 1360.00 Edging(591.00), sticks(85.00), 0 0 See Invoice List->
1-1/2" Rock TONS 40.50 $ 150.00 1-1/2" Local River Rock(4.00), 1-1/2" Grey River Rock(36.50), 1-1/2" Local River Rock(0.00), 0 0 See Invoice List->
Mulch SQ YD 25.00 $ 2550.00 Shredded Redwood Mulch(25.00), 0 0 See Invoice List->
Wall TONS 206.00 $ 2643.00 Wall Blocks(90.00), Wall Blocks(116.00), 0 0 See Invoice List->
Cap TONS 113.00 $ 999.50 Caps(26.00), Caps(87.00), 0 0 See Invoice List->
Pavers 1140.00 $ 2886.00 Pavers(444.00), Paver Patio SQFT(348.00), Pavers(348.00), 0 0 See Invoice List->
Topsoil TONS 15.00 $ 900.00 Top Soil(15.00), 0 0 See Invoice List->
Demo SQFT 440.00 $ 500.00 Demo Rock(440.00), 0 0 See Invoice List->
Tilling SQFT 6064.00 $ 0.00 Roto-tilling SF(6064.00), 0 0 See Invoice List->
Grading SQFT 6064.00 $ 0.00 Finish Grading SF(6064.00), 0 0 See Invoice List->
Compost TON 19.00 $ 950.00 Compost(19.00), 0 0 See Invoice List->
2" Tree 1.00 $ 425.00 Tree 2"(1.00), 0 0 See Invoice List->
15 Gallon Tree 2.00 $ 400.00 Tree 15 gal(2.00), 0 0 See Invoice List->
5 Gallon Shrub 35.00 $ 1575.00 Shrub 5 gal(35.00), 0 0 See Invoice List->
1 Gallon 205.00 $ 3690.00 Perennial 1 gal(205.00), 0 0 See Invoice List->
Miscellaneous 204.00 $ 15900.00 Miscellaneous(1.00), Miscellaneous(1.00), Miscellaneous(1.00), Miscellaneous(200.00), Miscellaneous(1.00), 0 0 See Invoice List->
Steppers 18.00 $ 630.00 2' by 2' Steppers(18.00), 0 0 See Invoice List->
8' Tree 1.00 $ 500.00 8' Tree(1.00), 0 0 See Invoice List->
6' Tree 1.00 $ 375.00 6' Tree(1.00), 0 0 See Invoice List->


Misc Items Needed:

Item Description Amount Needed Total Purchased, Units Total Purchased, Dollar Amount

Drain

1.00 0 0 See Invoice List->

Herc Rental

1.00 0 0 See Invoice List->

VRBO-see comments

1.00 0 0 See Invoice List->

per diem

200.00 0 0 See Invoice List->

extra lodging

1.00 0 0 See Invoice List->




Sod Edging 1-1/2" Rock Mulch Wall Cap Pavers Topsoil Demo Tilling Grading Compost 2" Tree 15 Gallon Tree 5 Gallon Shrub 1 Gallon Miscellaneous MOB Steppers 8' Tree 6' Tree Total
Productive Labor Hours 33.0000 21.0000 39.0000 15.0000 54.0000 45.0000 105.0000 12.0000 6.0000 12.0000 18.0000 15.0000 2.2500 4.5000 16.8000 49.2000 24.0000 0.00 15.0000 3.0000 6.0000 495.7500
GC Labor Hours 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MOB Labor Hours 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 75.0000 0.00 0.00 0.00 75.0000
Crew Labor Hours 11.00 7.00 13.00 5.00 18.00 15.00 35.00 4.00 2.00 4.00 6.00 5.00 0.75 1.50 5.60 16.40 8.00 0 5.00 1.00 2.00 165.25
Crew MOB Hours 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25.00 0 0 0 25.00
Edit - Landscaping_Software sod
tilling
grading
compost
sod
mob
edging
edging
pavers
poli sand
sand
roadbase
mob
demo
wall calculation
wall
cap
roadbase
1-1/2" rock
sand
pavers
pavers
poli sand
sand
roadbase
steppers
5 gallon shrub
plants
mob
1 gallon
8' tree
6' tree
2" tree
15 gallon tree
1-1/2" rock
fabric
mob
miscellaneous
wall calculation
wall
cap
roadbase
1-1/2" rock
sand
topsoil
mulch
miscellaneous
miscellaneous
miscellaneous
miscellaneous
mob