Materials Sheet

NOTE: You have to reload this page before the materials sheet will update, hit F5.

Category Units Amount Cost To Buy List Total Purchased, Units Total Purchased, Dollar Amount
Sod SQFT 10160.00 $ 2183.79 Sod(3370.00), Pallet(3370.00), Sod(1710.00), Pallet(1710.00), 0 0 See Invoice List->
Irrigation Zones ZONE 9.00 $ 2898.00 # of zones(9.00), 0 0 See Invoice List->
Fabric SQFT 3990.00 $ 289.28 Fabric(3560.00), Fabric(120.00), Fabric(310.00), 0 0 See Invoice List->
Edging FT 798.00 $ 1600.00 Edging(698.00), sticks(100.00), 0 0 See Invoice List->
1-1/2" Rock TONS 110.00 $ 1287.00 1-1/2" Mountain Granite(14.00), 1.5" Rock(24.00), 1-1/2" Local River Rock(72.00), 0 0 See Invoice List->
2"-4" Rock TONS 22.00 $ 2830.00 2"-4" Local Cobble(22.00), 0 0 See Invoice List->
Breeze 12.50 $ 937.50 Grey Breeze(4.50), Grey Breeze(2.50), Grey Breeze(5.50), 0 0 See Invoice List->
Boulders TONS 8.00 $ 2000.00 Brownstone(8.00), 0 0 See Invoice List->
Mulch SQ YD 4.00 $ 428.00 Cascade Cedar Mulch(4.00), 0 0 See Invoice List->
Wall TONS 120.00 $ 1158.00 Timber Retaining Wall(24.00), Wall Blocks(96.00), 0 0 See Invoice List->
Cap TONS 72.00 $ 612.00 Caps(72.00), 0 0 See Invoice List->
Timbers 12.00 $ 162.00 Timbers (ea.)(12.00), 0 0 See Invoice List->
Topsoil TONS 12.00 $ 585.00 Topsoil(12.00), 0 0 See Invoice List->
Tilling SQFT 5080.00 $ 0.00 Roto-tilling SF(3370.00), Roto-tilling SF(1710.00), 0 0 See Invoice List->
Grading SQFT 5080.00 $ 0.00 Finish Grading SF(3370.00), Finish Grading SF(1710.00), 0 0 See Invoice List->
Compost TON 17.00 $ 850.00 Compost(11.00), Compost(6.00), 0 0 See Invoice List->
Concrete 161.00 $ 2680.00 Concrete,Grey Broom(160.00), Concrete,Boom Pump(1.00), 0 0 See Invoice List->
Woodwork 397.00 $ 13535.00 Woodwork,Cedar 3-rail ranch(395.00), Woodwork,Gate(2.00), 0 0 See Invoice List->
Miscellaneous 1714.00 $ 471.00 Miscellaneous(4.00), Miscellaneous(1710.00), 0 0 See Invoice List->
6' Tree 6.00 $ 2250.00 6' Tree(6.00), 0 0 See Invoice List->


Misc Items Needed:

Item Description Amount Needed Total Purchased, Units Total Purchased, Dollar Amount

Downspouts

4.00 0 0 See Invoice List->

Native seed

1710.00 0 0 See Invoice List->




Sod Irrigation Zones Fabric Edging 1-1/2" Rock 2"-4" Rock Breeze Boulders Mulch Wall Cap Timbers Topsoil Tilling Grading Compost Concrete Woodwork Miscellaneous 6' Tree Total
Productive Labor Hours 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00 0.00 0.0000 0.0000 0.0000
GC Labor Hours 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.00 16.00 0 0 20.00
MOB Labor Hours 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0000
Crew Labor Hours 5.00 18.00 4.00 8.00 4.00 7.00 4.00 8.00 1.00 11.00 9.00 8.00 2.00 3.00 4.00 4.00 0 0 2.50 8.00 110.50
Crew MOB Hours 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00
Edit - Landscaping_Software edging
edging
mob
breeze
fabric
mulch
2"-4" rock
1-1/2" rock
wall
timbers
roadbase
sand
1-1/2" rock
topsoil
miscellaneous
boulders
boulder
mob
wall calculation
wall
cap
roadbase
1-1/2" rock
sand
breeze
fabric
concrete
mob
breeze
fabric
concrete
sod
tilling
grading
compost
sod
mob
sod
tilling
grading
compost
sod
miscellaneous
woodwork
woodwork
irrigation zones
drip
mob
6' tree
plants
mob
15 gallon tree