Materials Sheet

NOTE: You have to reload this page before the materials sheet will update, hit F5.

Category Units Amount Cost To Buy List Total Purchased, Units Total Purchased, Dollar Amount
Sod SQFT 1452.00 $ 564.10 Sod(726.00), Pallet(726.00), 0 0 See Invoice List->
Fabric SQFT 913.00 $ 66.20 Fabric(895.00), Fabric(18.00), 0 0 See Invoice List->
Edging FT 14.00 $ 32.00 Edging(12.00), sticks(2.00), 0 0 See Invoice List->
Concrete Curbing FT 82.00 $ 750.00 Concrete Curbing(82.00), 0 0 See Invoice List->
1-1/2" Rock TONS 4.50 $ 420.00 1.5" Rock(0.00), 1-1/2" Local River Rock(4.50), 0 0 See Invoice List->
2"-4" Rock TONS 8.50 $ 1116.70 2"-4" Horizon Cobble(6.00), 2"-4" Local Cobble(2.50), 0 0 See Invoice List->
Breeze 0.50 $ 169.50 Grey Breeze(0.50), 0 0 See Invoice List->
Timbers 9.00 $ 159.00 Timbers (ea.)(9.00), 0 0 See Invoice List->
Topsoil TONS 1.50 $ 225.00 Planters Mix Soil(1.50), Top Soil(0.00), 0 0 See Invoice List->
Demo SQFT 1079.00 $ 750.00 Demo Sod(726.00), Demo Rock(353.00), 0 0 See Invoice List->
Tilling SQFT 726.00 $ 0.00 Roto-tilling SF(726.00), 0 0 See Invoice List->
Grading SQFT 726.00 $ 0.00 Finish Grading SF(726.00), 0 0 See Invoice List->
Compost TON 3.00 $ 150.00 Compost(3.00), 0 0 See Invoice List->
5 Gallon Shrub 5.00 $ 175.00 Shrub 5 gal(5.00), 0 0 See Invoice List->
1 Gallon 1.00 $ 12.00 Perennial 1 gal(1.00), 0 0 See Invoice List->


Misc Items Needed:

Item Description Amount Needed Total Purchased, Units Total Purchased, Dollar Amount

Lattice

1.00 0 0 See Invoice List->




Sod Fabric Edging Concrete Curbing 1-1/2" Rock 2"-4" Rock Breeze Timbers Topsoil Demo Tilling Grading Compost 5 Gallon Shrub 1 Gallon MOB Total
Productive Labor Hours 6.0000 6.0000 3.0000 3.0000 6.0000 9.0000 3.0000 22.5000 3.0000 12.0000 3.0000 3.0000 3.0000 2.4000 0.2400 0.00 85.1400
GC Labor Hours 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MOB Labor Hours 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31.5000 31.5000
Crew Labor Hours 2.00 2.00 1.00 1.00 2.00 3.00 1.00 7.50 1.00 4.00 1.00 1.00 1.00 0.80 0.08 0 28.38
Crew MOB Hours 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10.50 10.50
Edit - Landscaping_Software demo
mob
sod
tilling
grading
compost
sod
demo
mob
fabric
concrete curbing
5 gallon shrub
plants
mob
1 gallon
topsoil
fabric
mob
wall
timbers
roadbase
sand
1-1/2" rock
topsoil
breeze
edging
edging
miscellaneous
mob
1-1/2" rock
2"-4" rock
2"-4" rock