Category Units Amount Cost To Buy List Total Purchased, Units Total Purchased, Dollar Amount
Sod SQFT 3008.00 $ 896.40 Sod(1504.00), Pallet(1504.00), 0 0 See Invoice List->
Fabric SQFT 2332.00 $ 169.07 Fabric(1465.00), Fabric(867.00), 0 0 See Invoice List->
Edging FT 258.00 $ 528.00 Edging(225.00), sticks(33.00), 0 0 See Invoice List->
1-1/2" Rock TONS 43.00 $ 1080.00 1-1/2" Local River Rock(8.00), 1-1/2" Local River Rock(5.00), 1-1/2" Local River Rock(30.00), 0 0 See Invoice List->
3/8" Pea Gravel TONS 5.00 $ 300.00 3/8" pea gravel(5.00), 0 0 See Invoice List->
Mulch SQ YD 8.00 $ 870.00 Shredded Redwood Mulch(8.00), 0 0 See Invoice List->
Wall TONS 80.00 $ 990.00 Wall Blocks(80.00), 0 0 See Invoice List->
Cap TONS 30.00 $ 255.00 Caps(30.00), 0 0 See Invoice List->
Topsoil TONS 24.00 $ 1500.00 Top Soil(24.00), 0 0 See Invoice List->
Demo SQFT 3858.00 $ 1250.00 Demo Sod(3058.00), Demo Sod(800.00), 0 0 See Invoice List->
Tilling SQFT 1504.00 $ 0.00 Roto-tilling SF(1504.00), 0 0 See Invoice List->
Grading SQFT 1504.00 $ 0.00 Finish Grading SF(1504.00), 0 0 See Invoice List->
Compost TON 5.00 $ 250.00 Compost(5.00), 0 0 See Invoice List->
5 Gallon Shrub 8.00 $ 360.00 Shrub 5 gal(3.00), Shrub 5 gal(5.00), 0 0 See Invoice List->
1 Gallon 22.00 $ 396.00 Perennial 1 gal(5.00), Perennial 1 gal(17.00), 0 0 See Invoice List->
3 Gallon Shrub 5.00 $ 155.00 3 Gallon Shrub(2.00), 3 Gallon Shrub(3.00), 0 0 See Invoice List->
Steppers 17.00 $ 595.00 2' by 2' Steppers(17.00), 0 0 See Invoice List->






Sod Fabric Edging 1-1/2" Rock 3/8" Pea Gravel Mulch Wall Cap Topsoil Demo Tilling Grading Compost 5 Gallon Shrub 1 Gallon MOB 3 Gallon Shrub Steppers Total
Productive Labor Hours 9.0000 6.0000 9.0000 15.0000 6.0000 6.0000 18.0000 12.0000 18.0000 27.0000 3.0000 6.0000 6.0000 3.8400 5.2800 0.00 30.0000 15.0000 195.1200
GC Labor Hours 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MOB Labor Hours 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.0000 0.00 0.00 42.0000
Crew Labor Hours 3.00 2.00 3.00 5.00 2.00 2.00 6.00 4.00 6.00 9.00 1.00 2.00 2.00 1.28 1.76 0 10.00 5.00 65.04
Crew MOB Hours 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 14.00 0 0 14.00
Edit - Landscaping_Software demo
mob
1-1/2" rock
fabric
mob
mulch
edging
edging
topsoil
sod
tilling
grading
compost
sod
mob
5 gallon shrub
plants
mob
3 gallon shrub
1 gallon
demo
mob
3/8" pea gravel
fabric
mob
1-1/2" rock
steppers
wall calculation
wall
cap
roadbase
1-1/2" rock
sand
mob
5 gallon shrub
plants
mob
3 gallon shrub
1 gallon