🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Joe Luzinski Bid #:3854 - install

Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Embedded edit pop-up window for: Area: Landscape Project Parent Item: Concrete,Grey Broom

Use CTRL and + or CTRL and - on your keyboard to zoom in and out to make the text bigger. To reset it, hold CTRL and press 0.

Landscape Project

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1 (OLD)
Concrete, Concrete,Grey Broom
0 13.00 %
863.20
9495.20 2836.23 13 378.60
13977.53
2 (OLD)
Concrete, Concrete,Boom Pump
0 600.00 %
3
Downspouts, Downspouts
0 75.00 %
30.00
330.00 98.57 2 450.00 134.42
1012.99
4
Demo, Demo Rock
SQFT 100.00 %
77.66 1 225.00 67.21
292.21
5

(Inches)
Topsoil, Top Soil
TONS 0 50.00 %
25.00
150
425.00 126.95 2 450.00 134.42
1136.37
6

(Inches)
1-1/2" Rock, 1-1/2" Black Granite
Ton 150.00 74.00 %
29.80
150
477.80 142.72 1 225.00 67.21
912.73
7
2" Tree, Tree 2"
0 425.00 %
42.50
467.50 139.64 0.75 168.75 50.41
826.30
8
1 Gallon, Perennial 1 gal
0 18.00 %
9.00
99.00 29.57 0.40 90.00 26.88
245.45
9
Plants, Tree/Plant Delivery Cost
0 %
275.0
275.00 82.14
357.14
11 (OLD)
Fabric, Fabric
SQFT 0 87.00 %
1.05
11.56 3.45 1 225.00 67.21
307.22
12 (OLD)
MOB, MOB
0 %
4 900.00 268.83
1168.83
13
1010.55 725.00 11841.06 Landscape Project Scope Total:
20866.647646103896103896103896
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/15/2025 10:45 AM

 
Edit - Landscaping_Software
Grand Total: $ 20866.647646103896103896103896