🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Chuck Bartholomew Bid #:3071 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

South Drive bed

Bed and breeze apth

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Sod
SQFT 100.00 %
10.00
150.00
260.00 77.66 1.00 225.00 67.21
629.87
2
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
18.00
150.00
348.00 103.95 1.00 225.00 67.21
744.16
3
PopOut


(Inches)
Breeze, Grey Breeze
Ton 0.00 39.00 %
7.80
150.00
235.80 70.43 1.00 225.00 67.21
598.44
4
PopOut
Edging, Edging
FT 0.00 %
2.00 450.00 134.42
584.42
5 ---
Edging, sticks
0.00 16.00 %
33.60
369.60 110.40
480.00
6
PopOut


(Inches)
Mulch, Choice Brown Mulch
SQ YD 0.00 60.00 %
3.00
150.00
183.00 54.66 1.00 225.00 67.21
529.87
7
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
3.06
33.66 10.05 1.00 225.00 67.21
335.91
8
PopOut
(OLD)
MOB, MOB
0.00 %
1.00 225.00 67.21
292.21
9
75.46 600.00 1430.06 South Drive bed Scope Total:
4194.88
 

sod

sod

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Sod, Sod
SQFT 0.00 0.35 %
74.90
250.38
1074.28 320.89 4.00 900.00 268.83
2564.00
2 ---
Tilling, Roto-tilling SF
SQFT 0.00 %
2.00 450.00 134.42
584.42
3 --- (OLD)
Grading, Finish Grading SF
SQFT 0.00 %
1.00 225.00 67.21
292.21
4 --- (OLD)
Compost, Compost
TON 0.00 50.00 %
35.00
385.00 115.00 2.00 450.00 134.42
1084.42
5 ---
Sod, Pallet
0.00 1.00 %
15.00
165.00 49.29
214.29
6
PopOut
Edging, Edging
FT 0.00 %
1.00 225.00 67.21
292.21
7 ---
Edging, sticks
0.00 16.00 %
19.20
211.20 63.09
274.29
8
PopOut
(OLD)
MOB, MOB
0.00 %
2.00 450.00 134.42
584.42
9
144.10 250.38 1835.48 sod Scope Total:
5890.26
 

Irrigation

Front and north side irrgation

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Backflow, Backflow
ZONE 0.00 150.00 %
15.00
165.00 49.29
214.29
2
PopOut
Controller, Clock
ZONE 0.00 150.00 %
15.00
165.00 49.29
214.29
3
PopOut
(OLD)
Irrigation Zones, # of zones
ZONE 0.00 322.00 %
161.00
1771.00 529.00 31.25 7031.25 2100.24
11431.49
5
PopOut
(OLD)
MOB, MOB
0.00 %
5.00 1125.00 336.04
1461.04
6
210.00 0.00 2310.00 Irrigation Scope Total:
13884.75
 

Demo existing weeds

Demo

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Sod
SQFT 300.00 %
30.00
450.00
780.00 232.99 5.00 1125.00 336.04
2474.03
2
PopOut
(OLD)
Miscellaneous, Miscellaneous


0.00 %
25.00
275.00 82.14 450.00 134.42
941.56
3
PopOut
(OLD)
MOB, MOB
0.00 %
1.00 225.00 67.21
292.21
4
55.00 450.00 1055.00 Demo existing weeds Scope Total:
3707.80
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/13/2025 10:31 PM

 
Edit - Landscaping_Software
Grand Total: $ 27677.69