🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: City of Greeley Bid #:2922 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Landscaping

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Sod
SQFT 200.00 %
20.00
300
520.00 155.32 3 675.00 201.62
1551.94
2
PopOut


(Feet)
Wall, Timber Retaining Wall
0 %
3 ---
Timbers, Timbers (ea.)
0 55.00 %
5.00
300.0
355.00 106.04 33.33 7499.25 2240.04
12900.33
4 ---
Roadbase, Road Base
0 35.00 %
0.10
150.0
151.10 45.13
230.23
5 ---
Sand, Sand
0 43.00 %
0.20
150.0
152.20 45.46
281.66
6 ---
1-1/2" Rock, 1.5" Rock
0 60.00 %
7
PopOut


(Inches)
3"-6" Rock, 3-6" Grand Mesa Gray River Rock
Ton 150.00 125.10 %
190.14
150
2241.54 669.55 5 1125.00 336.04
4372.13
8
PopOut
Edging, Edging
FT 0 %
3 675.00 201.62
876.62
10
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
10.82
118.99 35.54 1 225.00 67.21
446.74
11
PopOut
(OLD)
MOB, MOB
0 %
16 3600.00 1075.32
4675.32
12
288.66 1050.00 4225.23 Landscaping Scope Total:
26226.397000000000000000
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/15/2025 4:42 AM

 
Edit - Landscaping_Software
Grand Total: $ 26226.397000000000000000