🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Howard Morgan Bid #:2536 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Morgan front bed renovation

Remove rock, install new fabric, replace rock

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Rock
SQFT 200.00 %
20.00
300
520.00 -1045.25 2 470.00 -944.75
-1000.00
2
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
-1031.18 3 705.00 -1417.12
-712.12
3
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0 %
4 --- (OLD)
Wall, Wall Blocks
TONS 0 10.50 %
63.00
150.0
843.00 -1694.52 7 1645.00 -3306.62
-2513.14
5 --- (OLD)
Cap, Caps
TONS 0 8.50 %
37.40
411.40 -826.96 6 1410.00 -2834.24
-1839.80
6 ---
Roadbase, Road base
TONS 0 35.00 %
0.10
150.0
151.10 -303.73
-118.63
7 --- (OLD)
1-1/2" Rock, 1-1/2" Local River Rock
0 60.00 %
264.00
264.00
--Disabled--
8 ---
Sand, Sand
TONS 0 43.00 %
0.10
150.0
150.10
--Disabled--
9
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
6.00
150
216.00 -434.18 1 235.00 -472.37
-455.55
11
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
3.81
41.87 -84.16 1 235.00 -472.37
-279.66
12
PopOut
(OLD)
MOB, MOB
0 %
6 1410.00 -2834.24
-1424.24
13
404.41 1050.00 2857.47 Morgan front bed renovation Scope Total:
-8843.141250000000000000
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 6:18 PM

 
Edit - Landscaping_Software
Grand Total: $ -8843.141250000000000000