Customer: Howard Morgan Bid #:2536 - install |
Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details
|
Morgan front bed renovation |
Remove rock, install new fabric, replace rock |
Discount: 0.00 % | Customer can decline on the proposal: False |
| Item # | We Install | Error-CallTechSupport | ReuseMaterials |
L (Feet) |
W (Feet) |
H |
Enabled | Item | Difficulty | Amount | Units | Color | Dump Cost | UnitPrice | misc % | misc | tax |
Other+ Delivery |
Subtotal | Profit Margin Materials |
Labor Hours |
Labor Cost | GC Hours | Profit Margin Subs |
Profit Margin Labor |
total | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
|
Demo, Demo Rock
|
SQFT | 200.00 | % |
20.00
|
300
|
520.00 | -1045.25 | 2 | 470.00 | -944.75 |
-1000.00
|
|||||||||||||||||
| 2 |
|
|
|
(Inches) |
1-1/2" Rock, 1-1/2" Local River Rock
|
Ton | 0.00 | 60.00 | % |
|
|
-1031.18 | 3 | 705.00 | -1417.12 |
-712.12
|
||||||||||||||
| 3 |
|
|
|
(Feet) |
Wall Calculation, Block Retaining Wall
|
0 | % |
|
|
|
||||||||||||||||||||
| 4 | --- |
(OLD)
Wall, Wall Blocks
|
TONS | 0 | 10.50 | % |
63.00
|
150.0
|
843.00 | -1694.52 | 7 | 1645.00 | -3306.62 |
-2513.14
|
||||||||||||||||
| 5 | --- |
(OLD)
Cap, Caps
|
TONS | 0 | 8.50 | % |
37.40
|
|
411.40 | -826.96 | 6 | 1410.00 | -2834.24 |
-1839.80
|
||||||||||||||||
| 6 | --- |
Roadbase, Road base
|
TONS | 0 | 35.00 | % |
0.10
|
150.0
|
151.10 | -303.73 |
-118.63
|
|||||||||||||||||||
| 7 | --- |
(OLD)
1-1/2" Rock, 1-1/2" Local River Rock
|
0 | 60.00 | % |
264.00
|
|
264.00 |
|
|||||||||||||||||||||
| 8 | --- |
Sand, Sand
|
TONS | 0 | 43.00 | % |
0.10
|
150.0
|
150.10 |
|
||||||||||||||||||||
| 9 |
|
|
|
(Inches) |
1-1/2" Rock, 1-1/2" Local River Rock
|
Ton | 0.00 | 60.00 | % |
6.00
|
150
|
216.00 | -434.18 | 1 | 235.00 | -472.37 |
-455.55
|
|||||||||||||
| 10 |
|
|
|
(Inches) |
Topsoil, Planters Mix Soil
|
Yard | 0.00 | 50.00 | % |
10.00
|
150
|
260.00 | -522.63 | 1 | 235.00 | -472.37 |
-500.00
|
|||||||||||||
| 11 |
|
(OLD)
Fabric, Fabric
|
SQFT | 0 | 87.00 | % |
3.81
|
|
41.87 | -84.16 | 1 | 235.00 | -472.37 |
-279.66
|
||||||||||||||||
| 12 |
|
(OLD)
MOB, MOB
|
0 | % |
|
|
6 | 1410.00 | -2834.24 |
-1424.24
|
||||||||||||||||||||
| 404.41 | 1050.00 | 2857.47 | Morgan front bed renovation | Scope Total: | -8843.141250000000000000 |
This bid Created By: at 1/1/0001 12:00 AM
This bid last edited by: at 12/14/2025 6:18 PM