Customer: Devin Duszynski Bid #:2531 - install |
Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details
|
Turf |
Discount: 0.00 % | Customer can decline on the proposal: False |
| Item # | We Install | Error-CallTechSupport | ReuseMaterials |
L (Feet) |
W (Feet) |
H |
Enabled | Item | Difficulty | Amount | Units | Color | Dump Cost | UnitPrice | misc % | misc | tax |
Other+ Delivery |
Subtotal | Profit Margin Materials |
Labor Hours |
Labor Cost | GC Hours | Profit Margin Subs |
Profit Margin Labor |
total | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
|
Demo, Demo Sod
|
SQFT | 100.00 | % |
10.00
|
150
|
260.00 | 77.66 | 1 | 225.00 | 67.21 |
629.87
|
|||||||||||||||||
| 2 |
|
|
|
Artificial Turf, Artificial Turf
|
SQFT | 0 | 5.00 | % |
90.00
|
|
990.00 | 295.71 |
1285.71
|
|||||||||||||||||
| 3 | --- |
Breeze, Tan Breeze
|
0 | 60.00 | % |
18.00
|
150.0
|
348.00 | 103.95 |
451.95
|
||||||||||||||||||||
| 4 | --- |
Artificial Turf Install, Turf Install SF
|
0 | % |
|
300
|
300.00 | 89.61 | 3 | 675.00 | 201.62 |
1266.23
|
||||||||||||||||||
| 5 |
|
Edging, Edging
|
FT | 0 | % |
|
|
1 | 225.00 | 67.21 |
292.21
|
|||||||||||||||||||
| 6 | --- |
Edging, sticks
|
0 | 16.00 | % |
1.60
|
|
17.60 | 5.26 |
22.86
|
||||||||||||||||||||
| 7 |
|
|
|
(Inches) |
1-1/2" Rock, 1-1/2" Local River Rock
|
Ton | 0.00 | 60.00 | % |
3.00
|
150
|
183.00 | 54.66 | 1 | 225.00 | 67.21 |
529.87
|
|||||||||||||
| 8 |
|
(OLD)
Fabric, Fabric
|
SQFT | 0 | 87.00 | % |
0.09
|
|
0.96 | 0.29 | 1 | 225.00 | 67.21 |
293.46
|
||||||||||||||||
| 9 |
|
(OLD)
MOB, MOB
|
0 | % |
|
|
1 | 225.00 | 67.21 |
292.21
|
||||||||||||||||||||
| 122.69 | 750.00 | 2099.56 | Turf | Scope Total: | 5064.3670000000000000000 |
This bid Created By: at 1/1/0001 12:00 AM
This bid last edited by: at 12/14/2025 5:21 AM