Customer: Andy Ruberg Bid #:2484 - install |
Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details
|
fabric and rock |
fabric and rock |
Discount: 0.00 % | Customer can decline on the proposal: True |
| Item # | We Install | Error-CallTechSupport | ReuseMaterials |
L (Feet) |
W (Feet) |
H |
Enabled | Item | Difficulty | Amount | Units | Color | Dump Cost | UnitPrice | misc % | misc | tax |
Other+ Delivery |
Subtotal | Profit Margin Materials |
Labor Hours |
Labor Cost | GC Hours | Profit Margin Subs |
Profit Margin Labor |
total | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
|
|
|
(Inches) |
1-1/2" Rock, 1-1/2" Local River Rock
|
Ton | 0.00 | 60.00 | % |
24.00
|
150.00
|
414.00 | 123.66 | 2.00 | 450.00 | 134.42 |
1122.08
|
|||||||||||||
| 2 |
|
(OLD)
Fabric, Fabric
|
SQFT | 0.00 | 87.00 | % |
2.54
|
|
27.92 | 8.34 | 1.00 | 225.00 | 67.21 |
328.46
|
||||||||||||||||
| 3 |
|
(OLD)
MOB, MOB
|
0.00 | % |
|
|
1.50 | 337.50 | 100.81 |
438.31
|
||||||||||||||||||||
| 26.54 | 150.00 | 441.92 | fabric and rock | Scope Total: | 1888.85 |
Ruberg Landscape renovation |
Removal of water feature, level area |
Discount: 0.00 % | Customer can decline on the proposal: False |
| Item # | We Install | Error-CallTechSupport | ReuseMaterials |
L (Feet) |
W (Feet) |
H |
Enabled | Item | Difficulty | Amount | Units | Color | Dump Cost | UnitPrice | misc % | misc | tax |
Other+ Delivery |
Subtotal | Profit Margin Materials |
Labor Hours |
Labor Cost | GC Hours | Profit Margin Subs |
Profit Margin Labor |
total | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
|
Demo, Demo Rock
|
SQFT | 200.00 | % |
20.00
|
300.00
|
520.00 | 155.32 | 2.00 | 450.00 | 134.42 |
1259.74
|
|||||||||||||||||
| 2 |
|
(OLD)
Miscellaneous, Miscellaneous
|
0.00 | % |
|
1350.00 | 403.25 |
1753.25
|
||||||||||||||||||||||
| 3 |
|
|
|
(Inches) |
Topsoil, Top Soil
|
TONS | 0.00 | 50.00 | % |
50.00
|
150.00
|
700.00 | 209.09 | 4.00 | 900.00 | 268.83 |
2077.92
|
|||||||||||||
| 4 |
|
(OLD)
Fabric, Fabric
|
SQFT | 0.00 | 87.00 | % |
|
|
|
|||||||||||||||||||||
| 5 |
|
(OLD)
MOB, MOB
|
0.00 | % |
|
|
3.00 | 675.00 | 201.62 |
876.62
|
||||||||||||||||||||
| 70.00 | 450.00 | 1220.00 | Ruberg Landscape renovation | Scope Total: | 5967.53 |
This bid Created By: at 1/1/0001 12:00 AM
This bid last edited by: at 12/15/2025 2:41 AM