Raised Planter

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Feet)
Wall, Timber Retaining Wall
0 %
2 ---
Timbers, Timbers (ea.)
0 55.00 %
2.40
150.0
176.40 52.69 16.00 3600.00 1075.32
6200.41
3 ---
Roadbase, Road Base
0 35.00 %
0.10
150.0
151.10 45.13
230.23
4 ---
Sand, Sand
0 43.00 %
0.10
150.0
151.10 45.13
238.23
5 ---
1-1/2" Rock, 1.5" Rock
0 60.00 %
288.00
288.00
--Disabled--
6
PopOut


(Inches)
Topsoil, Top Soil
TONS 0 50.00 %
20.00
150
370.00 110.52 1 225.00 67.21
772.73
7
PopOut
Edging, Edging
FT 0 %
1 225.00 67.21
292.21
8 ---
Edging, sticks
0 16.00 %
11.20
123.20 36.80
160.00
9
PopOut


(Inches)
Breeze, Grey Breeze
Ton 0.00 39.00 %
7.80
150
235.80 70.43 1 225.00 67.21
598.44
10
PopOut
(OLD)
Miscellaneous, Miscellaneous


0 %
225.00 67.21
292.21
11
PopOut
Demo, Demo Rock
SQFT 100.00 %
10.00
150
260.00 77.66 1 225.00 67.21
629.87
12
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
1.45
15.95 4.76 1 225.00 67.21
312.92
13
PopOut
(OLD)
MOB, MOB
0 %
6 1350.00 403.25
1753.25
14
341.05 900.00 1771.55 Raised Planter Scope Total:
11480.500000000000000000
 

Flagstone Patio

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Flagstone, Flagstone Patio & Sidewalk SQFT
0 %
9 2025.00 604.87
2629.87
2 ---
Flagstone, Flagstone
0 %
81.98
300
1201.82 358.99
1560.81
3 ---
Patio, Poli-Sand Flagstone
0 60.00 %
36.00
396.00 118.29
514.29
4 ---
Sand, Sand
0 43.00 %
4.30
150
197.30 58.93
256.23
5 ---
Road Base, Road Base - Flagstone
0 35.00 %
10.50
150
265.50 79.31
344.81
6
PopOut
Edging, Edging
FT 0 %
1 225.00 67.21
292.21
7 ---
Edging, sticks
0 16.00 %
6.40
70.40 21.03
91.43
8
PopOut
Downspouts, Downspouts
0 75.00 %
15.00
165.00 49.29 1 225.00 67.21
506.50
9
PopOut
Demo, Demo Sod
SQFT 100.00 %
10.00
150
260.00 77.66 1 225.00 67.21
629.87
10
PopOut
(OLD)
MOB, MOB
0 %
3 675.00 201.62
876.62
11
164.18 750.00 2556.02 Flagstone Patio Scope Total:
7702.6440000000000000
 

Planting Bed

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
5 Gallon Shrub, Shrub 5 gal
0 45.00 %
22.50
247.50 73.93 0.80 180.00 53.77
555.20
2
PopOut
Plants, Tree/Plant Delivery Cost
0 %
275.0
275.00 82.14
357.14
3
PopOut


(Inches)
Breeze, Grey Breeze
Ton 0.00 39.00 %
9.75
150
257.25 76.84 1 225.00 67.21
626.30
4
PopOut
Edging, Edging
FT 0 %
4 900.00 268.83
1168.83
5 ---
Edging, sticks
0 16.00 %
62.40
686.40 205.03
891.43
7
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
1.81
19.94 5.96 1 225.00 67.21
318.11
8
PopOut
(OLD)
MOB, MOB
0 %
3 675.00 201.62
876.62
9
106.46 575.00 1746.09 Planting Bed Scope Total:
5423.497500000000000000
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 6:15 PM

 
Edit - Landscaping_Software
Grand Total: $ 24606.641500000000000000