🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Cindy Terwillinger Bid #:2382 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Terwillinger landscape renovation

Demo, install new irrigation system, roll-top edging, wood mulch, strip stone wall, irregular flagstone step, new sod

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Sod
SQFT 400.00 %
40.00
600.00
1040.00 310.65 8.00 1800.00 537.66
3688.31
2
PopOut
(OLD)
Miscellaneous, Miscellaneous


0.00 %
50.00 14.94 675.00 201.62
941.56
3
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0.00 %
4 --- (OLD)
Wall, Wall Blocks
TONS 0.00 10.50 %
169.01 5.00 1125.00 336.04
1461.04
5 --- (OLD)
Cap, Caps
TONS 0.00 8.50 %
22.10
22.10
--Disabled--
6 ---
Roadbase, Road base
TONS 0.00 35.00 %
0.10
150.00
151.10 45.13
230.23
7 --- (OLD)
1-1/2" Rock, 1-1/2" Local River Rock
0.00 60.00 %
156.00
156.00
--Disabled--
8
PopOut


Flagstone, Colorado Buff Flagstone
Ton 0.00 720.00 %
163.09 1.00 225.00 67.21
292.21
9
PopOut
(OLD)
Irrigation Zones, # of zones
ZONE 0.00 322.00 %
322.00
3542.00 1058.00 62.50 14062.50 4200.49
22862.99
10
PopOut
Edging, Edging
FT 0.00 %
2.00 450.00 134.42
584.42
11 ---
Edging, sticks
0.00 16.00 %
36.80
404.80 120.91
525.71
12
PopOut


(Inches)
Mulch, Western Red Cedar Mulch
Yard 0.00 71.30 %
0.71
150.00
157.84 47.15 2.00 450.00 134.42
789.41
13
PopOut
(OLD)
Sod, Sod
SQFT 0.00 0.35 %
112.18
374.99
1608.92 480.58 6.00 1350.00 403.25
3842.74
14 ---
Tilling, Roto-tilling SF
SQFT 0.00 %
2.00 450.00 134.42
584.42
15 --- (OLD)
Grading, Finish Grading SF
SQFT 0.00 %
3.00 675.00 201.62
876.62
16 --- (OLD)
Compost, Compost
TON 0.00 50.00 %
50.00
550.00 164.29 3.00 675.00 201.62
1590.91
17 ---
Sod, Pallet
0.00 1.00 %
24.00
264.00 78.86
342.86
18
PopOut
2" Tree, Tree 2"
0.00 425.00 %
42.50
467.50 139.64 0.75 168.75 50.41
826.30
19
PopOut
Plants, Tree/Plant Delivery Cost
0.00 %
275.00
275.00 82.14
357.14
20
PopOut
10 Gallon Tree, 10 Gallon Tree
0.00 165.00 %
66.00
726.00 216.86 7.00 1575.00 470.45
2988.31
21
PopOut
1 Gallon, Perennial 1 gal
0.00 18.00 %
21.60
237.60 70.97 0.96 216.00 64.52
589.09
22
PopOut
15 Gallon Tree, Tree 15 gal
0.00 200.00 %
60.00
660.00 197.14 2.25 506.25 151.22
1514.61
23
PopOut
5 Gallon Evergreen, Evergreen shrub, 5 gal
0.00 80.00 %
--Disabled--
24
PopOut
5 Gallon Shrub, Shrub 5 gal
0.00 45.00 %
22.50
247.50 73.93 0.80 180.00 53.77
555.20
26
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
7.29
80.15 23.94 1.00 225.00 67.21
396.30
27
PopOut
(OLD)
MOB, MOB
0.00 %
17.00 3825.00 1142.53
4967.53
28
989.98 1599.99 10708.71 Terwillinger landscape renovation Scope Total:
52065.31
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/13/2025 10:32 PM

 
Edit - Landscaping_Software
Grand Total: $ 52065.31