🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Gretchen MacLachlan Bid #:2327 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Side Yard

opposite side of garage

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: True
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Sod
SQFT 100.00 %
10.00
150
260.00 77.66 2 470.00 140.39
948.05
2
PopOut


(Inches)
Mulch, Washington Cedar Mulch
Yard 0.00 72.70 %
29.08
150
469.88 140.35 1 235.00 70.19
915.42
3
PopOut


(Inches)
Topsoil, Top Soil
TONS 0 50.00 %
20.00
150
370.00 110.52 1 235.00 70.19
785.71
4
PopOut
Edging, Edging
FT 0 %
2 470.00 140.39
610.39
5 ---
Edging, sticks
0 16.00 %
25.60
281.60 84.11
365.71
6
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
2.76
30.30 9.05 1 235.00 70.19
344.54
7
PopOut
(OLD)
MOB, MOB
0 %
4 940.00 280.78
1220.78
8
87.44 450.00 1411.78 Side Yard Scope Total:
5190.605000000000000000
 

Berm to back

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: True
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Rock
SQFT 100.00 %
10.00
150
260.00 77.66 1 235.00 70.19
642.85
2
PopOut


(Inches)
Topsoil, Top Soil
TONS 0 50.00 %
5.00
150
205.00 61.23 1 235.00 70.19
571.42
3
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
113.81 2 470.00 140.39
610.39
4
PopOut


(Inches)
Mulch, Western Red Cedar Mulch
Yard 0.00 71.30 %
0.07
150
150.78 45.04 1 235.00 70.19
501.01
5
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
2.90
31.90 9.53 1 235.00 70.19
346.62
6
PopOut
(OLD)
MOB, MOB
0 %
2 470.00 140.39
610.39
7
17.97 450.00 647.68 Berm to back Scope Total:
3282.684300000000000000
 

Demo & Grading behind garage

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Rock
SQFT 400.00 %
40.00
600
1040.00 310.65 5 1175.00 350.97
2876.62
2
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
57.00
150
777.00 232.09 4 940.00 280.78
2229.87
3
PopOut


(Inches)
Topsoil, Top Soil
TONS 0 50.00 %
90.00
300
1290.00 385.32 5 1175.00 350.97
3201.29
4
PopOut
Steppers, 2' by 2' Steppers
0 35.00 %
230.00 5 1175.00 350.97
1525.97
6
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
5.80
63.80 19.06 1 235.00 70.19
388.05
7
PopOut
(OLD)
MOB, MOB
0 %
8 1880.00 561.56
2441.56
8
200.30 1050.00 3253.30 Demo & Grading behind garage Scope Total:
13075.690000000000000000
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/13/2025 6:28 PM

 
Edit - Landscaping_Software
Grand Total: $ 21548.979300000000000000