🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Lynn Pepper Bid #:2313 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Water Feature

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Water Feature, liner
0.00 1.50 %
21.60
237.60 70.97
308.57
2
PopOut
Water Feature, vault
0.00 230.00 %
23.00
253.00 75.57
328.57
3
PopOut
Water Feature, bore
0.00 125.00 %
12.50
137.50 41.07
178.57
4
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
18.00
150.00
348.00 103.95 1.00 225.00 67.21
744.16
5
PopOut


(Inches)
2"-4" Rock, 2"-4" Grey Cobble
Ton 150.00 63.50 %
30.88
150.00
489.63 146.25 1.00 225.00 67.21
928.09
6
PopOut
Boulders, Colorado Buff Boulders
Ton 0.00 245.65 %
12.28
150.00
285.11 85.16 1.00 225.00 67.21
662.48
7
PopOut
Boulder, Boulder Delivery Cost
0.00 %
150.00
150.00 44.81
194.81
9
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
2.90
2.90
--Disabled--
10
PopOut
(OLD)
MOB, MOB
0.00 %
3.00 675.00 201.62
876.62
11
171.16 600.00 2453.74 Water Feature Scope Total:
7566.03
 

Plants

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
15 Gallon Tree, Tree 15 gal
0.00 200.00 %
40.00
440.00 131.43 1.50 337.50 100.81
1009.74
2
PopOut
Plants, Tree/Plant Delivery Cost
0.00 %
275.00
275.00 82.14
357.14
3
PopOut
2" Tree, Tree 2"
0.00 425.00 %
42.50
467.50 139.64 0.75 168.75 50.41
826.30
4
PopOut
1 Gallon, Perennial 1 gal
0.00 18.00 %
12.60
138.60 41.40 0.56 126.00 37.64
343.64
5
PopOut
(OLD)
MOB, MOB
0.00 %
1.50 337.50 100.81
438.31
6
95.10 275.00 1321.10 Plants Scope Total:
2975.13
 

Planting Bed

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Sod
SQFT 100.00 %
10.00
150.00
260.00 77.66 1.00 225.00 67.21
629.87
2
PopOut


(Inches)
Mulch, Washington Cedar Mulch
Yard 0.00 72.70 %
10.91
150.00
269.96 80.64 1.00 225.00 67.21
642.81
3
PopOut


(Inches)
Topsoil, Top Soil
TONS 0.00 50.00 %
10.00
150.00
260.00 77.66 1.00 225.00 67.21
629.87
4
PopOut
Edging, Edging
FT 0.00 %
1.00 225.00 67.21
292.21
5 ---
Edging, sticks
0.00 16.00 %
6.40
70.40 21.03
91.43
6
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
0.75
8.22 2.45 1.00 225.00 67.21
302.87
7
PopOut
(OLD)
MOB, MOB
0.00 %
1.50 337.50 100.81
438.31
8
38.06 450.00 868.58 Planting Bed Scope Total:
3027.37
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/15/2025 5:45 AM

 
Edit - Landscaping_Software
Grand Total: $ 13568.53