| 1 |
|
|
|
|
|
|
(Inches)
|
|
1-1/2" Rock, 1-1/2" Local River Rock
|
|
|
Ton |
|
0.00
|
60.00
|
%
|
48.00
|
|
150.00
|
678.00
|
202.52
|
|
3.00
|
675.00 |
|
|
201.62
|
1757.14
|
|
|
| 2 |
|
|
|
|
|
|
(Inches)
|
|
Mulch, Western Red Cedar Mulch
|
|
|
Yard |
|
0.00
|
71.30
|
%
|
0.32
|
|
150.00
|
153.53
|
45.86
|
|
1.00
|
225.00 |
|
|
67.21
|
491.60
|
|
|
| 3 |
|
|
|
|
|
|
(Inches)
|
|
Topsoil, Top Soil
|
|
|
TONS |
|
0.00
|
50.00
|
%
|
40.00
|
|
150.00
|
590.00
|
176.23
|
|
2.00
|
450.00 |
|
|
134.42
|
1350.65
|
|
|
| 4 |
|
|
|
|
|
|
|
|
Boulders, Aspen Boulders
|
|
|
Ton |
|
0.00
|
170.00
|
%
|
68.00
|
|
150.00
|
898.00
|
268.23
|
|
4.00
|
900.00 |
|
|
268.83
|
2335.06
|
|
|
| 5 |
|
|
|
|
|
|
|
|
Boulder, Boulder Delivery Cost
|
|
|
|
|
0.00
|
|
%
|
|
|
150.00
|
150.00
|
44.81
|
|
|
|
|
|
|
194.81
|
|
|
| 6 |
|
|
|
|
|
|
|
|
Edging, Edging
|
|
|
FT |
|
0.00
|
|
%
|
|
|
|
|
|
|
2.00
|
450.00 |
|
|
134.42
|
584.42
|
|
|
| 7 |
--- |
|
|
|
|
|
|
|
Edging, sticks
|
|
|
|
|
0.00
|
16.00
|
%
|
30.40
|
|
|
334.40
|
99.89
|
|
|
|
|
|
|
434.29
|
|
|
| 8 |
|
|
|
|
|
|
|
|
(OLD)
Fabric, Fabric
|
|
|
SQFT |
|
0.00
|
87.00
|
%
|
7.91
|
|
|
87.01
|
25.99
|
|
1.00
|
225.00 |
|
|
67.21
|
405.21
|
|
|
| 9 |
|
|
|
|
|
|
|
|
(OLD)
MOB, MOB
|
|
|
|
|
0.00
|
|
%
|
|
|
|
|
|
|
2.00
|
450.00 |
|
|
134.42
|
584.42
|
|
|
| 10 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
194.63 |
|
750.00 |
2890.94 |
|
|
|
|
Planting Bed |
Scope Total: |
|
8137.60 |
|
|