🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Jeff Ekstrand Bid #:17700 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Breeze Patio

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Inches)
3/8" Rock, 3/8" Gray Granite Chip
Ton 150.00 62.55 %
36.89
150
555.82 29.25 2 450.00 23.68
1058.75
3
PopOut
(OLD)
MOB, MOB
0 %
1.5 337.50 17.76
355.26
4
38.52 150.00 573.68 Breeze Patio Scope Total:
1669.651500000000000000
 

Plants and Trees

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
8' Tree, 8' Tree
0 500.00 %
50.00
550.00 28.95 1 225.00 11.84
815.79
2
PopOut
Plants, Tree/Plant Delivery Cost
0 %
275.0
275.00 14.47
289.47
3
PopOut
2" Tree, Tree 2"
0 425.00 %
382.50
4207.50 221.45 6.75 1518.75 79.93
6027.63
4
PopOut
15 Gallon Tree, Tree 15 gal
0 200.00 %
40.00
440.00 23.16 1.50 337.50 17.76
818.42
5
PopOut
5 Gallon Shrub, Shrub 5 gal
0 45.00 %
40.50
445.50 23.45 1.44 324.00 17.05
810.00
6
PopOut
1 Gallon, Perennial 1 gal
0 18.00 %
75.60
831.60 43.77 3.36 756.00 39.79
1671.16
7
PopOut
(OLD)
MOB, MOB
0 %
4.5 1012.50 53.29
1065.79
8
588.60 275.00 6749.60 Plants and Trees Scope Total:
11498.2600000000000000
 

Irrigation

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Irrigation Zones, # of zones
ZONE 0 322.00 %
193.20
2125.20 111.85 15.00 3375.00 177.63
5789.68
2
PopOut
Drip, Drip
ZONE 0 100.00 %
10.00
110.00 5.79
115.79
3
PopOut
(OLD)
MOB, MOB
0 %
4.5 1012.50 53.29
1065.79
4
203.20 0.00 2235.20 Irrigation Scope Total:
6971.2600000000000000
 

Sod

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Sod, Sod
SQFT 0 0.35 %
48.90
250.00
787.84 41.47 3 675.00 35.53
1539.84
2 ---
Tilling, Roto-tilling SF
SQFT 0 %
1 225.00 11.84
236.84
3 --- (OLD)
Grading, Finish Grading SF
SQFT 0 %
2 450.00 23.68
473.68
4 ---
Compost, Compost
TON 0 50.00 %
25.00
275.00 14.47 2 450.00 23.68
763.15
5 ---
Sod, Pallet
0 1.00 %
9.00
99.00 5.21
104.21
6
PopOut
(OLD)
MOB, MOB
0 %
3 675.00 35.53
710.53
7
82.90 250.00 1161.84 Sod Scope Total:
3828.2550000000000000
 

Raised Planters

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Feet)
Wall, Timber Retaining Wall
0 %
2 ---
Timbers, Timbers (ea.)
0 55.00 %
2.40
150.0
176.40 9.28 16.00 3600.00 189.47
5271.15
3 ---
Roadbase, Road Base
0 35.00 %
0.10
150.0
151.10 7.95
193.05
4 ---
Sand, Sand
0 43.00 %
0.10
150.0
151.10 7.95
201.05
5 ---
1-1/2" Rock, 1.5" Rock
0 60.00 %
360.00
360.00
--Disabled--
6
PopOut


(Inches)
Topsoil, Topsoil
Yard 0.00 36.25 %
10.88
150
269.62 14.19 1 225.00 11.84
520.66
7
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
0.44
0.44
--Disabled--
8
PopOut
(OLD)
MOB, MOB
0 %
4.5 1012.50 53.29
1065.79
9
373.91 600.00 1108.66 Raised Planters Scope Total:
7251.695000000000000000
 

Planting Bed

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Mountain Granite
Ton 150.00 70.50 %
117.22
150
1439.48 75.76 4 900.00 47.37
2462.60
2
PopOut


(Inches)
2"-4" Rock, 2"-4" White Cobble
Ton 150.00 105.80 %
131.38
150
1595.18 83.96 4 900.00 47.37
2626.51
3
PopOut


(Inches)
Mulch, Cascade Cedar Mulch
Yard 0.00 69.50 %
156.38
300
2020.12 106.32 4 900.00 47.37
3073.82
4
PopOut


(Inches)
3/8" Rock, 3/8" Gray Granite Chip
Ton 150.00 62.55 %
49.40
150
693.43 36.50 2 450.00 23.68
1203.61
5
PopOut
Boulders, Colorado Buff Boulders
Ton 0.00 245.65 %
110.54
150
260.54
--Disabled--
6
PopOut
Boulder, Boulder Delivery Cost
0 %
150.0
150.00 7.89
157.89
7
PopOut
Edging, Edging
FT 0 %
6 1350.00 71.05
1421.05
8 ---
Edging, sticks
0 16.00 %
113.60
1249.60 65.77
1315.37
9
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
32.77
360.47 18.97 4 900.00 47.37
1326.81
10
PopOut
(OLD)
MOB, MOB
0 %
6 1350.00 71.05
1421.05
11
711.30 1050.00 7768.82 Planting Bed Scope Total:
15008.707500000000000000
 

Firepit Wall

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0 %
2 --- (OLD)
Wall, Wall Blocks
TONS 0 10.50 %
151.20
150.0
1813.20 95.43 10 2250.00 118.42
4277.05
3 --- (OLD)
Cap, Caps
TONS 0 8.50 %
45.05
495.55 26.08 7 1575.00 82.89
2179.52
4 ---
Roadbase, Road base
TONS 0 35.00 %
0.10
150.0
151.10 7.95
193.05
5 ---
1-1/2" Rock, 1-1/2" Local River Rock
0 60.00 %
318.00
318.00
--Disabled--
6 ---
Sand, Sand
TONS 0 43.00 %
0.10
150.0
151.10 7.95
201.05
7
PopOut
(OLD)
MOB, MOB
0 %
4.5 1012.50 53.29
1065.79
8
514.45 450.00 2928.95 Firepit Wall Scope Total:
7916.460000000000000000
 

Trampoline Wall

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0 %
2 --- (OLD)
Wall, Wall Blocks
TONS 0 10.50 %
79.80
150.0
1027.80 54.09 6 1350.00 71.05
2502.94
3 --- (OLD)
Cap, Caps
TONS 0 8.50 %
23.80
261.80 13.78 4 900.00 47.37
1222.95
4 ---
Roadbase, Road base
TONS 0 35.00 %
0.10
150.0
151.10 7.95
193.05
5 ---
1-1/2" Rock, 1-1/2" Local River Rock
0 60.00 %
168.00
168.00
--Disabled--
6 ---
Sand, Sand
TONS 0 43.00 %
0.10
150.0
151.10 7.95
201.05
7
PopOut
(OLD)
MOB, MOB
0 %
3 675.00 35.53
710.53
8
271.80 450.00 1759.80 Trampoline Wall Scope Total:
4830.520000000000000000
 

Sport Court Wall

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0 %
2 --- (OLD)
Wall, Wall Blocks
TONS 0 10.50 %
155.40
150.0
1859.40 118.69 10 2250.00 143.62
4371.71
3 --- (OLD)
Cap, Caps
TONS 0 8.50 %
46.75
514.25 32.82 7 1575.00 100.53
2222.60
4 ---
Roadbase, Road base
TONS 0 35.00 %
0.10
150.0
151.10 9.64
194.74
5 ---
1-1/2" Rock, 1-1/2" Local River Rock
0 60.00 %
330.00
330.00
--Disabled--
6 ---
Sand, Sand
TONS 0 43.00 %
0.10
150.0
151.10 9.64
202.74
7
PopOut
(OLD)
MOB, MOB
0 %
4.5 1012.50 64.63
1077.13
8
532.35 450.00 3005.85 Sport Court Wall Scope Total:
8068.920000000000000000
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 6:35 AM

 
Edit - Landscaping_Software
Grand Total: $ 67043.729000000000000000