🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: test test Bid #:17686 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

324234

354

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Sod, Sod
SQFT 0 0.35 %
19.36
250.00
462.90 1549.73 1 225.00 753.26
2990.90
2 ---
Tilling, Roto-tilling SF
SQFT 0 %
1 225.00 712.50
937.50
3 --- (OLD)
Grading, Finish Grading SF
SQFT 0 %
1 225.00 712.50
937.50
4 ---
Compost, Compost
TON 0 50.00 %
10.00
110.00 348.33 1 225.00 712.50
1395.83
5 ---
Sod, Pallet
0 1.00 %
3.00
33.00 104.50
137.50
6
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0 %
7 ---
Wall, Wall Blocks
TONS 0 12.50 %
670.00
450.0
7820.00 24763.33 34 7650.00 24225.00
64458.33
8 ---
Cap, Caps
TONS 0 10.00 %
200.00
2200.00 6966.67 24 5400.00 17100.00
31666.67
9 ---
Roadbase, Road base
TONS 0 35.00 %
0.10
150.0
151.10 478.48
663.58
10 ---
1-1/2" Rock, 1-1/2" Local River Rock
0 60.00 %
11 ---
Sand, Sand
TONS 0 43.00 %
0.20
150.0
152.20 481.97
718.17
12
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0 %
13 ---
Wall, Wall Blocks
TONS 0 12.50 %
20 4500.00 14250.00
18750.00
14 ---
Cap, Caps
TONS 0 10.00 %
200.00
2200.00 6966.67 24 5400.00 17100.00
31666.67
15 ---
Roadbase, Road base
TONS 0 35.00 %
0.10
150.0
151.10 478.48
663.58
16 ---
1-1/2" Rock, 1-1/2" Local River Rock
0 60.00 %
18
PopOut
MOB, MOB
0 %
36 8100.00 25650.00
33750.00
19
1102.96 1300.00 13432.50 324234 Scope Total:
189454.395000000000000000
 
 

This bid Created By: justinyeater@atpslandscaping.com at 12/12/2025 4:14 AM


This bid last edited by: at 12/14/2025 6:25 AM

 
Edit - Landscaping_Software
Grand Total: $ 189454.395000000000000000