🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Michael Dejong Bid #:17520 - install

Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Embedded edit pop-up window for:
Area: Planting Bed
Parent Item: 1-1/2" Grey River Rock

Use CTRL and + or CTRL and - on your keyboard to zoom in and out to make the text bigger. To reset it, hold CTRL and press 0.

Planting Bed

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1

(Inches)
1-1/2" Rock, 1-1/2" Grey River Rock
Ton 450.00 57.00 %
13.00 3315.00 990.19
4305.19
2 (OLD)
Miscellaneous, Miscellaneous


0.00 %
70.00
420.00 125.45 2040.00 609.35
3194.80
3

(Feet)
Wall Calculation, Block Retaining Wall
0.00 %
4 --- (OLD)
Wall, Wall Blocks
TONS 0.00 10.50 %
121.80
150.00
1489.80 445.01 12.00 3060.00 914.03
5908.84
5 --- (OLD)
Cap, Caps
TONS 0.00 8.50 %
73.95
813.45 242.98 11.00 2805.00 837.86
4699.29
6 ---
Roadbase, Road base
TONS 0.00 35.00 %
0.10
150.00
151.10 45.13
230.23
7 ---
1-1/2" Rock, 1-1/2" Local River Rock
0.00 60.00 %
8 ---
Sand, Sand
TONS 0.00 43.00 %
0.10
150.00
151.10 45.13
238.23
9

(Inches)
Topsoil, Top Soil
TONS 0.00 50.00 %
150.00
150.00
1050.00 313.64 4.00 1020.00 304.68
2688.32
11 (OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
82.64
82.64
--Disabled--
12 (OLD)
MOB, MOB
0.00 %
8.00 2040.00 609.35
2649.35
13
723.59 900.00 6933.09 Planting Bed Scope Total:
29173.99
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 12:27 AM

 
Edit - Landscaping_Software
Grand Total: $ 29173.99