🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Front Range Village KimCo Bid #:17443 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Project 3

Mulch

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Rock
SQFT 100.00 %
10.00
150
260.00 77.66 1 225.00 67.21
629.87
2
PopOut


(Inches)
Mulch, Shredded Redwood Mulch
SQ YD 0.00 90.00 %
13.50
150
298.50 89.16 1 225.00 67.21
679.87
4
PopOut
(OLD)
MOB, MOB
0 %
2 450.00 134.42
584.42
5
24.59 300.00 570.46 Project 3 Scope Total:
2201.902500000000000000
 

Project 2-Turf

Artificial Turf

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Sod
SQFT 200.00 %
20.00
300
520.00 155.32 3 675.00 201.62
1551.94
2
PopOut


Artificial Turf, Artificial Turf
SQFT 0 5.00 %
750.00
8250.00 2464.29
10714.29
3 ---
Breeze, Tan Breeze
0 60.00 %
150.00
300.0
1950.00 582.47
2532.47
4 ---
Artificial Turf Install, Turf Install SF
0 %
600
600.00 179.22 34 7650.00 2285.06
10714.28
5
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
--Disabled--
6
PopOut
(OLD)
MOB, MOB
0 %
14 3150.00 940.91
4090.91
7
920.00 1200.00 11320.00 Project 2-Turf Scope Total:
29603.8900000000000000000
 

Project 1

Mirror South Side Entrance to North

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
39.00
150
579.00 172.95 3 675.00 201.62
1628.57
2
PopOut
Edging, Edging
FT 0 %
2 450.00 134.42
584.42
3 ---
Edging, sticks
0 16.00 %
35.20
387.20 115.66
502.86
4
PopOut
Demo, Demo Rock
SQFT 200.00 %
20.00
300
520.00 155.32 2 450.00 134.42
1259.74
5
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
3.84
42.27 12.63 1 225.00 67.21
347.11
6
PopOut
(OLD)
MOB, MOB
0 %
4 900.00 268.83
1168.83
7
98.04 450.00 1528.47 Project 1 Scope Total:
5491.527500000000000000
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 6:35 AM

 
Edit - Landscaping_Software
Grand Total: $ 37297.3200000000000000000