Customer: Aubreena Deforest Bid #:17368 - install |
Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details
|
Retaining Wall |
Discount: 0.00 % | Customer can decline on the proposal: False |
| Item # | We Install | Error-CallTechSupport | ReuseMaterials |
L (Feet) |
W (Feet) |
H |
Enabled | Item | Difficulty | Amount | Units | Color | Dump Cost | UnitPrice | misc % | misc | tax |
Other+ Delivery |
Subtotal | Profit Margin Materials |
Labor Hours |
Labor Cost | GC Hours | Profit Margin Subs |
Profit Margin Labor |
total | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
|
|
|
(Feet) |
Wall, Timber Retaining Wall
|
0.00 | % |
|
|
|
||||||||||||||||||||
| 2 | --- |
Timbers, Timbers (ea.)
|
0.00 | 55.00 | % |
0.40
|
150.00
|
154.40 | 46.12 | 2.67 |
416.52
|
|||||||||||||||||||
| 3 | --- |
Roadbase, Road Base
|
0.00 | 35.00 | % |
0.10
|
150.00
|
151.10 | 45.13 |
230.23
|
||||||||||||||||||||
| 4 | --- |
Sand, Sand
|
0.00 | 43.00 | % |
0.10
|
150.00
|
151.10 | 45.13 |
238.23
|
||||||||||||||||||||
| 5 | --- |
1-1/2" Rock, 1.5" Rock
|
0.00 | 60.00 | % |
72.00
|
|
72.00 |
|
|||||||||||||||||||||
| 6 |
|
|
|
(Inches) |
Topsoil, Top Soil
|
TONS | 0.00 | 50.00 | % |
|
|
|
||||||||||||||||||
| 7 |
|
(OLD)
Fabric, Fabric
|
SQFT | 0.00 | 87.00 | % |
|
|
|
|||||||||||||||||||||
| 8 |
|
(OLD)
MOB, MOB
|
0.00 | % |
|
|
|
|||||||||||||||||||||||
| 72.60 | 450.00 | 528.60 | Retaining Wall | Scope Total: | 884.98 |
Raised Planter Beds |
Discount: 0.00 % | Customer can decline on the proposal: False |
| Item # | We Install | Error-CallTechSupport | ReuseMaterials |
L (Feet) |
W (Feet) |
H |
Enabled | Item | Difficulty | Amount | Units | Color | Dump Cost | UnitPrice | misc % | misc | tax |
Other+ Delivery |
Subtotal | Profit Margin Materials |
Labor Hours |
Labor Cost | GC Hours | Profit Margin Subs |
Profit Margin Labor |
total | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
|
|
|
(Feet) |
Wall, Timber Retaining Wall
|
0.00 | % |
|
|
|
||||||||||||||||||||
| 2 | --- |
Timbers, Timbers (ea.)
|
0.00 | 55.00 | % |
2.10
|
150.00
|
173.10 | 51.71 | 14.00 |
1358.81
|
|||||||||||||||||||
| 3 | --- |
Roadbase, Road Base
|
0.00 | 35.00 | % |
0.10
|
150.00
|
151.10 | 45.13 |
230.23
|
||||||||||||||||||||
| 4 | --- |
Sand, Sand
|
0.00 | 43.00 | % |
0.10
|
150.00
|
151.10 | 45.13 |
238.23
|
||||||||||||||||||||
| 5 | --- |
1-1/2" Rock, 1.5" Rock
|
0.00 | 60.00 | % |
300.00
|
|
300.00 |
|
|||||||||||||||||||||
| 6 |
|
|
|
(Inches) |
Topsoil, Top Soil
|
TONS | 0.00 | 50.00 | % |
20.00
|
150.00
|
370.00 | 110.52 | 1.00 |
480.52
|
|||||||||||||||
| 7 |
|
(OLD)
Fabric, Fabric
|
SQFT | 0.00 | 87.00 | % |
|
|
|
|||||||||||||||||||||
| 8 |
|
(OLD)
MOB, MOB
|
0.00 | % |
|
|
|
|||||||||||||||||||||||
| 322.30 | 600.00 | 1145.30 | Raised Planter Beds | Scope Total: | 2307.79 |
Dog Run |
Discount: 0.00 % | Customer can decline on the proposal: False |
| Item # | We Install | Error-CallTechSupport | ReuseMaterials |
L (Feet) |
W (Feet) |
H |
Enabled | Item | Difficulty | Amount | Units | Color | Dump Cost | UnitPrice | misc % | misc | tax |
Other+ Delivery |
Subtotal | Profit Margin Materials |
Labor Hours |
Labor Cost | GC Hours | Profit Margin Subs |
Profit Margin Labor |
total | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
|
Demo, Demo Rock
|
SQFT | 100.00 | % |
10.00
|
150.00
|
260.00 | 77.66 | 1.00 |
337.66
|
|||||||||||||||||||
| 2 |
|
|
|
(Inches) |
3/8" Pea Gravel, 3/8" pea gravel
|
TONS | 0.00 | 60.00 | % |
18.00
|
|
198.00 | 59.14 | 1.00 |
257.14
|
|||||||||||||||
| 3 |
|
(OLD)
Fabric, Fabric
|
SQFT | 0.00 | 87.00 | % |
1.89
|
|
20.74 | 6.19 | 1.00 |
26.93
|
||||||||||||||||||
| 4 |
|
(OLD)
MOB, MOB
|
0.00 | % |
|
|
|
|||||||||||||||||||||||
| 29.89 | 150.00 | 478.74 | Dog Run | Scope Total: | 621.73 |
Backyard Planting Bed |
Discount: 0.00 % | Customer can decline on the proposal: False |
| Item # | We Install | Error-CallTechSupport | ReuseMaterials |
L (Feet) |
W (Feet) |
H |
Enabled | Item | Difficulty | Amount | Units | Color | Dump Cost | UnitPrice | misc % | misc | tax |
Other+ Delivery |
Subtotal | Profit Margin Materials |
Labor Hours |
Labor Cost | GC Hours | Profit Margin Subs |
Profit Margin Labor |
total | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
|
Demo, Demo Rock
|
SQFT | 400.00 | % |
40.00
|
600.00
|
1040.00 | 310.65 | 4.00 |
1350.65
|
|||||||||||||||||||
| 2 |
|
|
|
(Inches) |
1-1/2" Rock, 1-1/2" Local River Rock
|
Ton | 0.00 | 60.00 | % |
66.00
|
150.00
|
876.00 | 261.66 | 4.00 |
1137.66
|
|||||||||||||||
| 3 |
|
Edging, Edging
|
FT | 0.00 | % |
|
|
2.00 |
|
|||||||||||||||||||||
| 4 | --- |
Edging, sticks
|
0.00 | 16.00 | % |
22.40
|
|
246.40 | 73.60 |
320.00
|
||||||||||||||||||||
| 5 |
|
(OLD)
Fabric, Fabric
|
SQFT | 0.00 | 87.00 | % |
6.76
|
|
74.33 | 22.20 | 1.00 |
96.53
|
||||||||||||||||||
| 6 |
|
(OLD)
MOB, MOB
|
0.00 | % |
|
|
|
|||||||||||||||||||||||
| 135.16 | 750.00 | 2236.73 | Backyard Planting Bed | Scope Total: | 2904.84 |
Flagstone Path |
Discount: 0.00 % | Customer can decline on the proposal: False |
| Item # | We Install | Error-CallTechSupport | ReuseMaterials |
L (Feet) |
W (Feet) |
H |
Enabled | Item | Difficulty | Amount | Units | Color | Dump Cost | UnitPrice | misc % | misc | tax |
Other+ Delivery |
Subtotal | Profit Margin Materials |
Labor Hours |
Labor Cost | GC Hours | Profit Margin Subs |
Profit Margin Labor |
total | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
|
Flagstone, Flagstone Patio & Sidewalk SQFT
|
0.00 | % |
|
|
8.00 |
|
||||||||||||||||||||||
| 2 | --- |
Flagstone, Flagstone
|
0.00 | % |
73.69
|
300.00
|
1110.57 | 331.73 |
1442.30
|
|||||||||||||||||||||
| 3 | --- |
Patio, Poli-Sand Flagstone
|
0.00 | 60.00 | % |
36.00
|
|
396.00 | 118.29 |
514.29
|
||||||||||||||||||||
| 4 | --- |
Sand, Sand
|
0.00 | 43.00 | % |
4.30
|
150.00
|
197.30 | 58.93 |
256.23
|
||||||||||||||||||||
| 5 | --- |
Road Base, Road Base - Flagstone
|
0.00 | 35.00 | % |
10.50
|
150.00
|
265.50 | 79.31 |
344.81
|
||||||||||||||||||||
| 6 |
|
(OLD)
MOB, MOB
|
0.00 | % |
|
|
|
|||||||||||||||||||||||
| 124.49 | 600.00 | 1969.37 | Flagstone Path | Scope Total: | 2557.63 |
Front yard |
Discount: 0.00 % | Customer can decline on the proposal: False |
| Item # | We Install | Error-CallTechSupport | ReuseMaterials |
L (Feet) |
W (Feet) |
H |
Enabled | Item | Difficulty | Amount | Units | Color | Dump Cost | UnitPrice | misc % | misc | tax |
Other+ Delivery |
Subtotal | Profit Margin Materials |
Labor Hours |
Labor Cost | GC Hours | Profit Margin Subs |
Profit Margin Labor |
total | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
|
Demo, Demo Rock
|
SQFT | 500.00 | % |
50.00
|
750.00
|
1300.00 | 388.31 | 5.00 |
1688.31
|
|||||||||||||||||||
| 2 |
|
|
|
(Inches) |
1-1/2" Rock, 1-1/2" Local River Rock
|
Ton | 0.00 | 60.00 | % |
24.00
|
150.00
|
414.00 | 123.66 | 2.00 |
537.66
|
|||||||||||||||
| 3 |
|
|
|
(Inches) |
Mulch, Cascade Cedar Mulch
|
Yard | 0.00 | 69.50 | % |
17.38
|
150.00
|
341.13 | 101.89 | 1.00 |
443.02
|
|||||||||||||||
| 4 |
|
Edging, Edging
|
FT | 0.00 | % |
|
|
2.00 |
|
|||||||||||||||||||||
| 5 | --- |
Edging, sticks
|
0.00 | 16.00 | % |
35.20
|
|
387.20 | 115.66 |
502.86
|
||||||||||||||||||||
| 6 |
|
(OLD)
Fabric, Fabric
|
SQFT | 0.00 | 87.00 | % |
4.02
|
|
44.26 | 13.22 | 1.00 |
57.48
|
||||||||||||||||||
| 7 |
|
(OLD)
MOB, MOB
|
0.00 | % |
|
|
|
|||||||||||||||||||||||
| 130.60 | 1050.00 | 2486.59 | Front yard | Scope Total: | 3229.33 |
This bid Created By: at 1/1/0001 12:00 AM
This bid last edited by: at 12/14/2025 4:28 PM