🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Aaron Lopez Bid #:17345 - install

Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Embedded edit pop-up window for: Area: Landscape Parent Item: Edging

Use CTRL and + or CTRL and - on your keyboard to zoom in and out to make the text bigger. To reset it, hold CTRL and press 0.

Landscape

Landscape

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
Edging, Edging
FT 0.00 %
8.00
2 ---
Edging, sticks
0.00 16.00 %
160.00
1760.00 386.34
2146.34
3

(Inches)
Breeze, Grey Breeze
Ton 0.00 39.00 %
17.55
150.00
343.05 75.30 1.00
418.35
4

(Inches)
Mulch, Cascade Cedar Mulch
Yard 0.00 69.50 %
27.80
150.00
455.80 100.05 1.00
555.85
5

(Inches)
2"-4" Rock, 2"-4" Local Cobble
Ton 0.00 115.00 %
253.00
300.00
3083.00 676.76 7.00
3759.76
6

(Inches)
1-1/2" Rock, 1-1/2" Mountain Granite
Ton 150.00 70.50 %
113.70
150.00
1400.70 307.47 4.00
1708.17
7

(Feet)
Wall, Timber Retaining Wall
0.00 %
8 ---
Timbers, Timbers (ea.)
0.00 55.00 %
1.20
150.00
163.20 35.82 8.00
847.02
9 ---
Roadbase, Road Base
0.00 35.00 %
0.10
150.00
150.10
--Disabled--
10 ---
Sand, Sand
0.00 43.00 %
0.10
150.00
150.10
--Disabled--
11 ---
1-1/2" Rock, 1.5" Rock
0.00 60.00 %
144.00
144.00
--Disabled--
12

(Inches)
Topsoil, Topsoil
Yard 0.00 36.25 %
43.50
150.00
628.50 137.96 2.00
766.46
14 (OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
25.81
283.91 62.32 2.00
346.23
15 (OLD)
MOB, MOB
0.00 %
16
816.76 1350.00 8892.36 Landscape Scope Total:
10950.62
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/15/2025 3:35 AM

 
Edit - Landscaping_Software