🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Aaron Lopez Bid #:17345 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Plants

Plants

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
6' Tree, 6' Tree
0 375.00 %
225.00
2475.00 543.29 8
3018.29
2
PopOut
Plants, Tree/Plant Delivery Cost
0 %
275.0
275.00 60.37
335.37
4
PopOut
(OLD)
MOB, MOB
0 %
5
225.00 275.00 2750.00 Plants Scope Total:
3353.6600000000000000
 

Irrigation

Irrigation

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Irrigation Zones, # of zones
ZONE 0 322.00 %
289.80
3187.80 699.76 18.00
3887.56
2
PopOut
Drip, Drip
ZONE 0 100.00 %
20.00
220.00 48.29
268.29
3
PopOut
(OLD)
MOB, MOB
0 %
4
309.80 0.00 3407.80 Irrigation Scope Total:
4155.8500000000000000
 

Fence

Fence

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Woodwork, Woodwork,Cedar 3-rail ranch
0 33.00 %
1303.50
14338.50 15
15801.00
2
PopOut
(OLD)
Woodwork, Woodwork,Gate
0 250.00 %
50.00
550.00 1
647.50
3
1353.50 0.00 14888.50 Fence Scope Total:
16448.5000000000000000
 

SOD

Sod

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Sod, Sod
SQFT 0 0.35 %
117.95
394.29
1691.74 371.36 5
2063.10
2 ---
Tilling, Roto-tilling SF
SQFT 0 %
2
3 --- (OLD)
Grading, Finish Grading SF
SQFT 0 %
2
4 ---
Compost, Compost
TON 0 50.00 %
55.00
605.00 132.80 2
737.80
5 ---
Sod, Pallet
0 1.00 %
24.00
264.00 57.95
321.95
6
PopOut
(OLD)
Sod, Sod
SQFT 0 0.35 %
59.85
250.00
309.85
--Disabled--
7 ---
Tilling, Roto-tilling SF
SQFT 0 %
1
8 --- (OLD)
Grading, Finish Grading SF
SQFT 0 %
2
9 ---
Compost, Compost
TON 0 50.00 %
30.00
330.00 72.44 2
402.44
10 ---
Sod, Pallet
0 1.00 %
12.00
132.00 28.98
160.98
11
PopOut
(OLD)
Miscellaneous, Miscellaneous


0 %
17.10
188.10 41.29
229.39
12
PopOut
(OLD)
MOB, MOB
0 %
13
315.90 644.29 3520.69 SOD Scope Total:
3915.6600000000000000
 

Patio

Patio

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Concrete, Concrete,Grey Broom
0 13.00 %
208.00
2288.00 3
2580.50
2
PopOut


(Inches)
Breeze, Grey Breeze
Ton 0.00 39.00 %
21.45
150
385.95 84.72 2
470.67
3
PopOut
(OLD)
Concrete, Concrete,Boom Pump
0 600.00 %
60.00
660.00 1
757.50
4
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
2.25
24.72 5.43 1
30.15
5
PopOut
(OLD)
MOB, MOB
0 %
6
291.70 150.00 3358.67 Patio Scope Total:
3838.822500000000000000
 

Walls

Walls

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Boulders, Brownstone
TONS 0.00 250.00 %
200.00
2200.00 482.93 8
2682.93
2
PopOut
Boulder, Boulder Delivery Cost
0 %
150.0
150.00 32.93
182.93
3
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0 %
4 --- (OLD)
Wall, Wall Blocks
TONS 0 10.50 %
100.80
150.0
1258.80 276.32 11
1535.12
5 --- (OLD)
Cap, Caps
TONS 0 8.50 %
61.20
673.20 147.78 9
820.98
6 ---
Roadbase, Road base
TONS 0 35.00 %
0.10
150.0
151.10 33.17
218.27
7 ---
1-1/2" Rock, 1-1/2" Local River Rock
0 60.00 %
432.00
432.00
--Disabled--
8 ---
Sand, Sand
TONS 0 43.00 %
0.10
150.0
151.10 33.17
226.27
9
PopOut


(Inches)
Breeze, Grey Breeze
Ton 0.00 39.00 %
9.75
150
257.25 56.47 1
313.72
10
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
0.87
9.57 2.10 1
11.67
11
PopOut
(OLD)
MOB, MOB
0 %
12
804.82 750.00 5283.02 Walls Scope Total:
5991.890000000000000000
 

Landscape

Landscape

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Edging, Edging
FT 0 %
8
2 ---
Edging, sticks
0 16.00 %
160.00
1760.00 386.34
2146.34
3
PopOut


(Inches)
Breeze, Grey Breeze
Ton 0.00 39.00 %
17.55
150
343.05 75.30 1
418.35
4
PopOut


(Inches)
Mulch, Cascade Cedar Mulch
Yard 0.00 69.50 %
27.80
150
455.80 100.05 1
555.85
5
PopOut


(Inches)
2"-4" Rock, 2"-4" Local Cobble
Ton 0.00 115.00 %
253.00
300
3083.00 676.76 7
3759.76
6
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Mountain Granite
Ton 150.00 70.50 %
113.70
150
1400.70 307.47 4
1708.17
7
PopOut


(Feet)
Wall, Timber Retaining Wall
0 %
8 ---
Timbers, Timbers (ea.)
0 55.00 %
1.20
150.0
163.20 35.82 8.00
847.02
9 ---
Roadbase, Road Base
0 35.00 %
0.10
150.0
150.10
--Disabled--
10 ---
Sand, Sand
0 43.00 %
0.10
150.0
150.10
--Disabled--
11 ---
1-1/2" Rock, 1.5" Rock
0 60.00 %
144.00
144.00
--Disabled--
12
PopOut


(Inches)
Topsoil, Topsoil
Yard 0.00 36.25 %
43.50
150
628.50 137.96 2
766.46
13
PopOut
(OLD)
Miscellaneous, Miscellaneous


0 %
30.00
330.00 72.44
402.44
14
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
25.81
283.91 62.32 2
346.23
15
PopOut
(OLD)
MOB, MOB
0 %
16
816.76 1350.00 8892.36 Landscape Scope Total:
10950.620000000000000000
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 6:39 AM

 
Edit - Landscaping_Software
Grand Total: $ 48655.002500000000000000