🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Ken Sponsler Bid #:1734 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Backyard

back north east corner

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: True
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Rock
SQFT 200.00 %
20.00
300.00
520.00 155.32 3.00 675.00 201.62
1551.94
2
PopOut


(Inches)
Mulch, Shredded Redwood Mulch
SQ YD 0.00 90.00 %
18.00
150.00
348.00 103.95 1.00 225.00 67.21
744.16
4
PopOut
(OLD)
MOB, MOB
0.00 %
2.00 450.00 134.42
584.42
5
39.45 450.00 883.95 Backyard Scope Total:
3193.44
 

Front

driveway north side

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Rock
SQFT 200.00 %
20.00
300.00
520.00 155.32 2.00 450.00 134.42
1259.74
2
PopOut


(Inches)
Mulch, Shredded Redwood Mulch
SQ YD 0.00 90.00 %
22.50
150.00
397.50 118.73 1.00 225.00 67.21
808.44
3
PopOut


(Inches)
2"-4" Rock, 2"-4" White Cobble
Ton 150.00 105.80 %
30.87
150.00
489.57 146.24 1.00 225.00 67.21
928.02
4
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
2.43
26.72 7.98 1.00 225.00 67.21
326.91
5
PopOut
(OLD)
MOB, MOB
0.00 %
2.00 450.00 134.42
584.42
6
75.80 600.00 1433.79 Front Scope Total:
3907.53
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/15/2025 12:53 AM

 
Edit - Landscaping_Software
Grand Total: $ 7100.97