🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Aaron Lopez Bid #:17205 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Plants

Plants

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
6' Tree, 6' Tree
0 375.00 %
225.00
2475.00 543.29 8 1800.00 537.66
5355.95
2
PopOut
Plants, Tree/Plant Delivery Cost
0 %
275.0
275.00 60.37
335.37
3
PopOut
15 Gallon Tree, Tree 15 gal
0 200.00 %
4
PopOut
(OLD)
MOB, MOB
0 %
3 675.00 201.62
876.62
5
225.00 275.00 2750.00 Plants Scope Total:
6567.9400000000000000
 

Irrigation

Irrigation

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Irrigation Zones, # of zones
ZONE 0 322.00 %
289.80
3187.80 699.76 18.00 4050.00 1209.74
9147.30
2
PopOut
Drip, Drip
ZONE 0 100.00 %
20.00
220.00 48.29
268.29
3
PopOut
(OLD)
MOB, MOB
0 %
4.5 1012.50 302.44
1314.94
4
309.80 0.00 3407.80 Irrigation Scope Total:
10730.5300000000000000
 

Fence

Fence

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Woodwork, Woodwork,Cedar 3-rail ranch
0 33.00 %
1303.50
14338.50 3147.48 18 385.24
19626.22
2
PopOut
(OLD)
Woodwork, Woodwork,Gate
0 250.00 %
50.00
550.00 120.73 1 21.40
789.63
3
1353.50 0.00 14888.50 Fence Scope Total:
20415.856341463414634146341463
 

SOD

Sod

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Sod, Sod
SQFT 0 0.35 %
117.95
394.29
1691.74 371.36 5 1125.00 336.04
3524.14
2 ---
Tilling, Roto-tilling SF
SQFT 0 %
2 450.00 134.42
584.42
3 --- (OLD)
Grading, Finish Grading SF
SQFT 0 %
2 450.00 134.42
584.42
4 ---
Compost, Compost
TON 0 50.00 %
55.00
605.00 132.80 2 450.00 134.42
1322.22
5 ---
Sod, Pallet
0 1.00 %
24.00
264.00 57.95
321.95
6
PopOut
(OLD)
Sod, Sod
SQFT 0 0.35 %
59.85
250.00
309.85
--Disabled--
7 ---
Tilling, Roto-tilling SF
SQFT 0 %
1 225.00 67.21
292.21
8 --- (OLD)
Grading, Finish Grading SF
SQFT 0 %
2 450.00 134.42
584.42
9 ---
Compost, Compost
TON 0 50.00 %
30.00
330.00 72.44 2 450.00 134.42
986.86
10 ---
Sod, Pallet
0 1.00 %
12.00
132.00 28.98
160.98
11
PopOut
(OLD)
Miscellaneous, Miscellaneous


0 %
17.10
188.10 41.29 225.00 67.21
521.60
12
PopOut
(OLD)
MOB, MOB
0 %
4.5 1012.50 302.44
1314.94
13
315.90 644.29 3520.69 SOD Scope Total:
10198.1600000000000000
 

Patio

Patio

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Concrete, Concrete,Grey Broom
0 13.00 %
208.00
2288.00 502.24 3 64.21
3146.95
2
PopOut


(Inches)
Breeze, Grey Breeze
Ton 0.00 39.00 %
21.45
150
385.95 84.72 2 450.00 134.42
1055.09
3
PopOut
(OLD)
Concrete, Concrete,Boom Pump
0 600.00 %
60.00
660.00 144.88 1 21.40
923.78
4
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
2.25
24.72 5.43 1 225.00 67.21
322.36
5
PopOut
(OLD)
MOB, MOB
0 %
1.5 337.50 100.81
438.31
6
291.70 150.00 3358.67 Patio Scope Total:
5886.4922560975609756097560976
 

Walls

Walls

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Boulders, Brownstone
TONS 0.00 250.00 %
200.00
2200.00 482.93 8 1800.00 537.66
5020.59
2
PopOut
Boulder, Boulder Delivery Cost
0 %
150.0
150.00 32.93
182.93
3
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0 %
4 --- (OLD)
Wall, Wall Blocks
TONS 0 10.50 %
100.80
150.0
1258.80 276.32 11 2475.00 739.29
4749.41
5 --- (OLD)
Cap, Caps
TONS 0 8.50 %
61.20
673.20 147.78 9 2025.00 604.87
3450.85
6 ---
Roadbase, Road base
TONS 0 35.00 %
0.10
150.0
151.10 33.17
218.27
7 ---
1-1/2" Rock, 1-1/2" Local River Rock
0 60.00 %
432.00
432.00
--Disabled--
8 ---
Sand, Sand
TONS 0 43.00 %
0.10
150.0
151.10 33.17
226.27
9
PopOut


(Inches)
Breeze, Grey Breeze
Ton 0.00 39.00 %
9.75
150
257.25 56.47 1 225.00 67.21
605.93
10
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
0.87
9.57 2.10 1 225.00 67.21
303.88
11
PopOut
(OLD)
MOB, MOB
0 %
7.5 1687.50 504.06
2191.56
12
804.82 750.00 5283.02 Walls Scope Total:
16949.690000000000000000
 

Landscape

Landscape

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Edging, Edging
FT 0 %
8 1800.00 537.66
2337.66
2 ---
Edging, sticks
0 16.00 %
160.00
1760.00 386.34
2146.34
3
PopOut


(Inches)
Breeze, Grey Breeze
Ton 0.00 39.00 %
17.55
150
343.05 75.30 1 225.00 67.21
710.56
4
PopOut


(Inches)
Mulch, Cascade Cedar Mulch
Yard 0.00 69.50 %
27.80
150
455.80 100.05 1 225.00 67.21
848.06
5
PopOut


(Inches)
2"-4" Rock, 2"-4" Local Cobble
Ton 0.00 115.00 %
253.00
300
3083.00 676.76 7 1575.00 470.45
5805.21
6
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Mountain Granite
Ton 150.00 70.50 %
113.70
150
1400.70 307.47 4 900.00 268.83
2877.00
7
PopOut


(Feet)
Wall, Timber Retaining Wall
0 %
8 ---
Timbers, Timbers (ea.)
0 55.00 %
1.20
150.0
163.20 35.82 8.00 1800.00 537.66
3184.68
9 ---
Roadbase, Road Base
0 35.00 %
0.10
150.0
150.10
--Disabled--
10 ---
Sand, Sand
0 43.00 %
0.10
150.0
150.10
--Disabled--
11 ---
1-1/2" Rock, 1.5" Rock
0 60.00 %
144.00
144.00
--Disabled--
12
PopOut


(Inches)
Topsoil, Topsoil
Yard 0.00 36.25 %
43.50
150
628.50 137.96 2 450.00 134.42
1350.88
14
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
25.81
283.91 62.32 2 450.00 134.42
930.65
15
PopOut
(OLD)
MOB, MOB
0 %
9 2025.00 604.87
2629.87
16
816.76 1350.00 8892.36 Landscape Scope Total:
23661.660000000000000000
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 6:35 AM

 
Edit - Landscaping_Software
Grand Total: $ 94410.32859756097560975609755