🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Monica Fonseca Bid #:16745 - install

Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Embedded edit pop-up window for:
Area: Option 1
Parent Item: Demo Sod

Use CTRL and + or CTRL and - on your keyboard to zoom in and out to make the text bigger. To reset it, hold CTRL and press 0.

Option 1

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
Demo, Demo Sod
SQFT 200.00 %
20.00
300
520.00 -1045.25 3 675.00 -1356.82
-1207.07
2 (OLD)
Sod, Sod
SQFT 0 0.35 %
45.88
250.00
754.74 -1517.09 3 675.00 -1356.82
-1444.18
3 ---
Tilling, Roto-tilling SF
SQFT 0 %
1 225.00 -452.27
-227.27
4 --- (OLD)
Grading, Finish Grading SF
SQFT 0 %
2 450.00 -904.55
-454.55
5 ---
Compost, Compost
TON 0 50.00 %
20.00
220.00 -442.22 1 225.00 -452.27
-449.49
6 ---
Sod, Pallet
0 1.00 %
9.00
99.00 -199.00
-100.00
7

(Inches)
Mulch, Shredded Redwood Mulch
SQ YD 0.00 90.00 %
9.00
150
249.00 -500.52 1 225.00 -452.27
-478.79
8
Edging, Edging
FT 0 %
1 225.00 -452.27
-227.27
9 ---
Edging, sticks
0 16.00 %
8.00
88.00 -176.89
-88.89
11 (OLD)
Fabric, Fabric
SQFT 0 87.00 %
0.56
6.14 -12.34 1 225.00 -452.27
-233.47
12 (OLD)
MOB, MOB
0 %
6 1350.00 -2713.64
-1363.64
13
176.84 700.00 2645.28 Option 1 Scope Total:
-8126.534250000000000000
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 11:08 AM

 
Edit - Landscaping_Software