🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Kristy Morris Bid #:16700 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Planting Bed

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Sod
SQFT 100.00 %
10.00
150.00
260.00 77.66 1.00 225.00 67.21
629.87
2
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Mountain Granite
Ton 150.00 70.50 %
128.84 1.00 225.00 67.21
292.21
3
PopOut


(Inches)
Topsoil, Top Soil
TONS 0.00 50.00 %
10.00
150.00
260.00 77.66 1.00 225.00 67.21
629.87
4
PopOut
Water Feature, liner
0.00 1.50 %
7.50
82.50 24.64 225.00 67.21
399.35
5
PopOut
Downspouts, Downspouts
0.00 75.00 %
7.50
82.50 24.64 1.00 225.00 67.21
399.35
6
PopOut
1 Gallon, Perennial 1 gal
0.00 18.00 %
5.40
59.40 17.74 0.24 54.00 16.13
147.27
7
PopOut
Plants, Tree/Plant Delivery Cost
0.00 %
275.00
275.00 82.14
357.14
9
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
0.69
7.58 2.26 1.00 225.00 67.21
302.05
10
PopOut
(OLD)
MOB, MOB
0.00 %
1.50 337.50 100.81
438.31
11
41.09 575.00 1026.98 Planting Bed Scope Total:
3528.21
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 10:34 PM

 
Edit - Landscaping_Software
Grand Total: $ 3528.21