Customer: Sciaroni Ashley Bid #:1634 - install |
Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details
|
Planting Bed |
Discount: 0.00 % | Customer can decline on the proposal: False |
| Item # | We Install | Error-CallTechSupport | ReuseMaterials |
L (Feet) |
W (Feet) |
H |
Enabled | Item | Difficulty | Amount | Units | Color | Dump Cost | UnitPrice | misc % | misc | tax |
Other+ Delivery |
Subtotal | Profit Margin Materials |
Labor Hours |
Labor Cost | GC Hours | Profit Margin Subs |
Profit Margin Labor |
total | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
|
(OLD)
Demo, Demo Rock
|
SQFT | 300.00 | % |
30.00
|
450.00
|
780.00 | 232.99 | 3.00 | 675.00 | 201.62 |
1889.61
|
|||||||||||||||||
| 2 |
|
|
|
(Inches) |
(OLD)
3/8" Pea Gravel, 3/8" pea gravel
|
TONS | 0.00 | 60.00 | % |
48.00
|
|
528.00 | 157.71 | 3.00 | 675.00 | 201.62 |
1562.33
|
|||||||||||||
| 3 |
|
(OLD)
Concrete Curbing, Concrete Curbing
|
FT | 0.00 | 4.50 | % |
52.20
|
|
802.20 | 239.62 | 2.00 | 450.00 | 134.42 |
1626.24
|
||||||||||||||||
| 4 |
|
|
|
(Feet) |
Wall Calculation, Block Retaining Wall
|
0.00 | % |
|
|
|
||||||||||||||||||||
| 5 | --- |
(OLD)
Wall, Wall Blocks
|
TONS | 0.00 | 10.50 | % |
30.45
|
150.00
|
484.95 | 144.86 | 5.00 | 1125.00 | 336.04 |
2090.85
|
||||||||||||||||
| 6 | --- |
(OLD)
Cap, Caps
|
TONS | 0.00 | 8.50 | % |
36.55
|
|
402.05 | 120.09 | 6.00 | 1350.00 | 403.25 |
2275.39
|
||||||||||||||||
| 7 | --- |
(OLD)
Roadbase, Road base
|
TONS | 0.00 | 35.00 | % |
0.10
|
150.00
|
151.10 | 45.13 |
230.23
|
|||||||||||||||||||
| 8 | --- |
1-1/2" Rock, 1-1/2" Local River Rock
|
0.00 | 60.00 | % |
|
|
|
||||||||||||||||||||||
| 9 |
|
|
|
(Inches) |
(OLD)
Topsoil, Topsoil
|
Yard | 0.00 | 36.25 | % |
18.13
|
150.00
|
349.38 | 104.36 | 2.00 | 450.00 | 134.42 |
1038.16
|
|||||||||||||
| 10 |
|
(OLD)
Fabric, Fabric
|
SQFT | 0.00 | 87.00 | % |
7.18
|
|
78.96 | 23.58 | 1.00 | 225.00 | 67.21 |
394.74
|
||||||||||||||||
| 11 |
|
(OLD)
MOB, MOB
|
0.00 | % |
|
|
4.00 | 900.00 | 268.83 |
1168.83
|
||||||||||||||||||||
| 222.61 | 900.00 | 3576.64 | Planting Bed | Scope Total: | 12276.38 |