🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Aubreena Deforest Bid #:11843 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Backyard

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Rock
SQFT 400.00 %
40.00
600.00
1040.00 310.65 4.00 900.00 268.83
2519.48
2
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
66.00
150.00
876.00 261.66 4.00 900.00 268.83
2306.49
3
PopOut


(Feet)
Wall, Timber Retaining Wall
0.00 %
4 ---
Timbers, Timbers (ea.)
0.00 55.00 %
0.40
150.00
154.40 46.12 2.67 600.75 179.44
1196.71
5 ---
Roadbase, Road Base
0.00 35.00 %
0.10
150.00
151.10 45.13
230.23
6 ---
Sand, Sand
0.00 43.00 %
0.10
150.00
151.10 45.13
238.23
7 ---
1-1/2" Rock, 1.5" Rock
0.00 60.00 %
72.00
792.00 236.57
1028.57
8
PopOut
Edging, Edging
FT 0.00 %
2.00 450.00 134.42
584.42
9 ---
Edging, sticks
0.00 16.00 %
22.40
246.40 73.60
320.00
10
PopOut


(Feet)
Wall, Timber Retaining Wall
0.00 %
11 ---
Timbers, Timbers (ea.)
0.00 55.00 %
2.10
150.00
173.10 51.71 14.00 3150.00 940.91
5449.72
12 ---
Roadbase, Road Base
0.00 35.00 %
0.10
150.00
151.10 45.13
230.23
13 ---
Sand, Sand
0.00 43.00 %
0.10
150.00
151.10 45.13
238.23
14 ---
1-1/2" Rock, 1.5" Rock
0.00 60.00 %
300.00
3300.00 985.71
4285.71
15
PopOut


(Inches)
3/8" Pea Gravel, 3/8" pea gravel
TONS 0.00 60.00 %
18.00
198.00 59.14 1.00 225.00 67.21
549.35
17
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
8.64
95.06 28.40 1.00 225.00 67.21
415.67
18
PopOut
(OLD)
MOB, MOB
0.00 %
10.00 2250.00 672.08
2922.08
19
549.94 1800.00 7849.36 Backyard Scope Total:
23287.85
 

Frontyard

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Rock
SQFT 500.00 %
50.00
750.00
1300.00 388.31 5.00 1125.00 336.04
3149.35
2
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
24.00
150.00
414.00 123.66 2.00 450.00 134.42
1122.08
3
PopOut


(Inches)
Mulch, Cascade Cedar Mulch
Yard 0.00 69.50 %
17.38
150.00
341.13 101.89 1.00 225.00 67.21
735.23
4
PopOut
Edging, Edging
FT 0.00 %
2.00 450.00 134.42
584.42
5 ---
Edging, sticks
0.00 16.00 %
35.20
387.20 115.66
502.86
6
PopOut
Flagstone, Flagstone Patio & Sidewalk SQFT
0.00 %
4.00 900.00 268.83
1168.83
7 ---
Flagstone, Flagstone
0.00 %
30.74
150.00
488.18 145.82
634.00
8 ---
Patio, Poli-Sand Flagstone
0.00 60.00 %
18.00
198.00 59.14
257.14
9 ---
Sand, Sand
0.00 43.00 %
4.30
150.00
197.30 58.93
256.23
10 ---
Road Base, Road Base - Flagstone
0.00 35.00 %
7.00
150.00
227.00 67.81
294.81
11
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
4.02
44.26 13.22 1.00 225.00 67.21
349.69
12
PopOut
(OLD)
MOB, MOB
0.00 %
6.00 1350.00 403.25
1753.25
13
190.64 1500.00 3597.07 Frontyard Scope Total:
10807.89
 
 

This bid Created By: at 10/1/2025 2:23 PM


This bid last edited by: at 12/15/2025 8:44 AM

 
Edit - Landscaping_Software
Grand Total: $ 34095.74