🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Clifton Castle Bid #:10543 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Retaining Wall

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Sod
SQFT 200.00 %
20.00
300.00
520.00 155.32 3.00 675.00 201.62
1551.94
2
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
24.00
150.00
414.00 123.66 2.00 450.00 134.42
1122.08
3
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0.00 %
4 --- (OLD)
Wall, Wall Blocks
TONS 0.00 10.50 %
201.60
150.00
2367.60 707.21 13.00 2925.00 873.70
6873.51
5 --- (OLD)
Cap, Caps
TONS 0.00 8.50 %
61.20
673.20 201.09 9.00 2025.00 604.87
3504.16
6 ---
Roadbase, Road base
TONS 0.00 35.00 %
0.10
150.00
151.10 45.13
230.23
7 ---
1-1/2" Rock, 1-1/2" Local River Rock
0.00 60.00 %
43.20
475.20 141.94 3.00 675.00 201.62
1493.76
8 ---
Sand, Sand
TONS 0.00 43.00 %
0.10
150.00
151.10 45.13
238.23
10
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
2.36
25.92 7.74 1.00 225.00 67.21
325.87
11
PopOut
(OLD)
MOB, MOB
0.00 %
5.00 1125.00 336.04
1461.04
12
377.56 900.00 5053.12 Retaining Wall Scope Total:
17450.17
 

Sod

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Sod, Sod
SQFT 0.00 0.35 %
0.84
250.00
259.24 77.44 1.00 225.00 67.21
628.89
2 ---
Tilling, Roto-tilling SF
SQFT 0.00 %
1.00 225.00 67.21
292.21
3 --- (OLD)
Grading, Finish Grading SF
SQFT 0.00 %
1.00 225.00 67.21
292.21
4 --- (OLD)
Compost, Compost
TON 0.00 50.00 %
5.00
55.00 16.43 1.00 225.00 67.21
363.64
5 ---
Sod, Pallet
0.00 1.00 %
6
PopOut
(OLD)
MOB, MOB
0.00 %
1.00 225.00 67.21
292.21
7
5.84 250.00 314.24 Sod Scope Total:
1869.16
 

Planting Bed

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Rock
SQFT 300.00 %
30.00
450.00
780.00 232.99 3.00 675.00 201.62
1889.61
2
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
33.00
150.00
513.00 153.23 2.00 450.00 134.42
1250.65
3
PopOut
(OLD)
Miscellaneous, Miscellaneous


0.00 %
40.00
440.00 131.43
571.43
4
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
3.26
35.89 10.72 1.00 225.00 67.21
338.82
5
PopOut
(OLD)
MOB, MOB
0.00 %
1.00 225.00 67.21
292.21
6
106.26 600.00 1768.89 Planting Bed Scope Total:
4342.72
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/15/2025 3:03 PM

 
Edit - Landscaping_Software
Grand Total: $ 23662.05