🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Samantha Deveraux Bid #:17289 - holidaylighting

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Side Rooflines and Back Rooflines

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Roofline, C9 LED Roofline (Bulbs Included)
FT 0

%
14.52
304.97 112.80 4.55 316.68 79.17
813.62
2 ---
, Takedown
0 %
1.95 135.72 33.93
169.65
3
PopOut
(OLD)
, Holiday Lighting Minimum 150 and 8 Hour Labor Reconciliation
0 1.00 %
135.48
135.48 1.5 104.40
239.88
5
150.00 0.00 575.93 Side Rooflines and Back Rooflines Scope Total:
1223.1525000000000000
 

Front Roofline

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Roofline, C9 LED Roofline (Bulbs Included)
FT 0

%
11.78
247.28 91.46 3.85 267.96 66.99
673.68
2 ---
, Takedown
0 %
1.65 114.84 28.71
143.55
3
PopOut
(OLD)
, Holiday Lighting Minimum 150 and 8 Hour Labor Reconciliation
0 1.00 %
138.22
138.22 1.5 104.40
242.62
4
PopOut
(OLD)
MOB, MOB
0 %
1 69.60 17.40
87.00
5
150.00 0.00 523.72 Front Roofline Scope Total:
1146.8550000000000000
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 6:38 AM

 
Edit - Landscaping_Software
Grand Total: $ 2370.0075000000000000