🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Jodi Saunders Bid #:17272 - holidaylighting

Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Embedded edit pop-up window for:
Area: Roofline
Parent Item: C9 LED Roofline (Bulbs Included)

Use CTRL and + or CTRL and - on your keyboard to zoom in and out to make the text bigger. To reset it, hold CTRL and press 0.

Roofline

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
Roofline, C9 LED Roofline (Bulbs Included)
FT 0.00

%
23.55
494.55 182.92 7.35 511.56 127.89
1316.92
2 ---
, Takedown
0.00 %
3.15 219.24 54.81
274.05
3 (OLD)
, Holiday Lighting Minimum 150 and 8 Hour Labor Reconciliation
0.00 1.00 %
123.88
123.88
123.88
4
, Timer
0.00 32.24 %
1.61
33.85 12.52 0.50 34.80 8.70
89.87
5
Misc, Connectors
0.00 1.28 %
0.51
10.75 3.98 0.27 18.56 4.64
37.93
7 (OLD)
MOB, MOB
0.00 %
2.00 139.20 34.80
174.00
8
150.00 0.00 796.36 Roofline Scope Total:
2038.30
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 10:09 PM

 
Edit - Landscaping_Software
Grand Total: $ 2038.30