🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Jodi Saunders Bid #:17272 - holidaylighting

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Tree Wrapping

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut

Tree Wrapping, Swagging - Canopy Lights - 36"
FT 0.00 0.96 %
16.88
354.49 131.11 2.46 171.34 42.83
699.77
2 ---
, Installation and Removal - Swagging Canopy Lights
0.00 0.60 %
1.05 79.07 19.77
98.84
3
PopOut
(OLD)
, Holiday Lighting Minimum 150 and 8 Hour Labor Reconciliation
0.00 1.00 %
129.52
129.52 2.36 164.26
293.78
4
PopOut
Misc, Blank Wire
0.00 0.45 %
1.35
28.35 10.49 0.30 20.88 5.22
64.94
5
PopOut
, Timer
0.00 32.24 %
1.61
33.85 12.52 0.50 34.80 8.70
89.87
7
PopOut
(OLD)
MOB, MOB
0.00 %
1.00 69.60 17.40
87.00
8
150.00 0.00 689.17 Tree Wrapping Scope Total:
1381.61
 

Roofline

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Roofline, C9 LED Roofline (Bulbs Included)
FT 0.00

%
23.55
494.55 182.92 7.35 511.56 127.89
1316.92
2 ---
, Takedown
0.00 %
3.15 219.24 54.81
274.05
3
PopOut
(OLD)
, Holiday Lighting Minimum 150 and 8 Hour Labor Reconciliation
0.00 1.00 %
123.88
123.88
123.88
4
PopOut
, Timer
0.00 32.24 %
1.61
33.85 12.52 0.50 34.80 8.70
89.87
5
PopOut
Misc, Connectors
0.00 1.28 %
0.51
10.75 3.98 0.27 18.56 4.64
37.93
6
PopOut
Misc, Blank Wire
0.00 0.45 %
0.45
9.45 3.50 0.10 6.96 1.74
21.65
7
PopOut
(OLD)
MOB, MOB
0.00 %
2.00 139.20 34.80
174.00
8
150.00 0.00 796.36 Roofline Scope Total:
2038.30
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 10:56 AM

 
Edit - Landscaping_Software
Grand Total: $ 3419.91