🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Life Care Bridge Bid #:17249 - holidaylighting

Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Embedded edit pop-up window for: Area: East and North ROOFLINE 2nd Story Parent Item: C9 LED Roofline (Bulbs Included)

Use CTRL and + or CTRL and - on your keyboard to zoom in and out to make the text bigger. To reset it, hold CTRL and press 0.

East and North ROOFLINE 2nd Story

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
Roofline, C9 LED Roofline (Bulbs Included)
FT 0.00

%
37.29
783.04 138.18 11.20 779.52 194.88
1895.62
2 ---
, Takedown
0.00 %
4.80 334.08 83.52
417.60
3 (OLD)
, Holiday Lighting Minimum 150 and 8 Hour Labor Reconciliation
0.00 1.00 %
104.04
104.04
104.04
4
, Timer
0.00 32.24 %
1.61
33.85 5.97 0.50 34.80 8.70
83.32
5
Misc, Blank Wire
0.00 0.45 %
4.50
94.50 16.68 1.00 69.60 17.40
198.18
6
Misc, Connectors
0.00 1.28 %
2.56
53.76 9.49 1.33 92.80 23.20
179.25
8 (OLD)
MOB, MOB
0.00 %
4.00 278.40 69.60
348.00
9
150.00 0.00 1173.23 East and North ROOFLINE 2nd Story Scope Total:
3487.01
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/15/2025 10:55 AM

 
Edit - Landscaping_Software
Grand Total: $ 3487.01