🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Cassidy Lundmark Bid #:17245 - holidaylighting

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Aspen Tree

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut

Tree Wrapping, Swagging - Canopy Lights - 36"
FT 0.00 0.96 %
25.32
531.74 196.67 3.69 257.01 64.25
1049.67
2 ---
, Installation and Removal - Swagging Canopy Lights
0.00 0.60 %
1.58 118.61 29.65
148.26
3
PopOut
(OLD)
, Holiday Lighting Minimum 150 and 8 Hour Labor Reconciliation
0.00 1.00 %
121.79
121.79 0.83 57.77
179.56
4
PopOut
, Timer
0.00 32.24 %
1.61
33.85 12.52 0.50 34.80 8.70
89.87
5
PopOut
Misc, Blank Wire
0.00 0.45 %
0.90
18.90 6.99 0.20 13.92 3.48
43.29
7
PopOut
(OLD)
MOB, MOB
0.00 %
1.00 69.60 17.40
87.00
8
150.00 0.00 836.13 Aspen Tree Scope Total:
1626.09
 

Roofline

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Roofline, C9 LED Roofline (Bulbs Included)
FT 0.00

%
13.35
280.25 103.65 4.20 292.32 73.08
749.30
2 ---
, Takedown
0.00 %
1.80 125.28 31.32
156.60
3
PopOut
(OLD)
, Holiday Lighting Minimum 150 and 8 Hour Labor Reconciliation
0.00 1.00 %
133.72
133.72 0.02 1.39
135.11
4
PopOut
, Timer
0.00 32.24 %
1.61
33.85 12.52 0.50 34.80 8.70
89.87
5
PopOut
Misc, Blank Wire
0.00 0.45 %
0.68
14.18 5.24 0.15 10.44 2.61
32.47
6
PopOut
Misc, Connectors
0.00 1.28 %
0.64
13.44 4.97 0.33 23.20 5.80
47.41
7
PopOut
Rental, 50 Foot Towable Boom
0.00 365.00 %
365.00
506.75
8
PopOut
(OLD)
MOB, MOB
0.00 %
1.00 69.60 17.40
87.00
9
150.00 0.00 974.16 Roofline Scope Total:
1804.51
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 11:21 AM

 
Edit - Landscaping_Software
Grand Total: $ 3430.60