🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: 34 Marketplace Bid #:17236 - holidaylighting

Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Embedded edit pop-up window for: Area: ROOFLINE for SE Building Parent Item: C9 LED Roofline (Bulbs Included)

Use CTRL and + or CTRL and - on your keyboard to zoom in and out to make the text bigger. To reset it, hold CTRL and press 0.

ROOFLINE for SE Building

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
Roofline, C9 LED Roofline (Bulbs Included)
FT 0.00

%
44.04
924.81 231.20 11.90 828.24 146.16
2130.41
2 ---
, Takedown
0.00 %
5.10 354.96 62.64
417.60
3 (OLD)
, Holiday Lighting Minimum 150 and 8 Hour Labor Reconciliation
0.00 1.00 %
58.78
58.78
58.78
4
, Timer
0.00 32.24 %
1.61
33.85 8.46 0.50 34.80 6.14
83.25
5
Misc, Blank Wire
0.00 0.45 %
4.50
94.50 23.62 1.00 69.60 12.28
200.00
6
Misc, Connectors
0.00 1.28 %
2.82
59.14 14.78 1.47 102.08 18.01
194.01
8 (OLD)
MOB, MOB
0.00 %
--Disabled--
9
150.00 0.00 2033.11 ROOFLINE for SE Building Scope Total:
4164.61
 

This bid Created By: joshquinn@atpslandscaping.com at 11/7/2025 1:26 PM


This bid last edited by: at 12/15/2025 5:26 AM

 
Edit - Landscaping_Software
Grand Total: $ 4164.61